HTS Heading 8206
Tools of two or more of headings 8202 to 8205, put up in sets for retail sale
The HTS code under heading 8206 (tools of two or more of headings 8202 to 8205), with its duty rates from the 2026 HTS Revision 23.
Every line of heading 8206
- 8206.00.00.00 Tools of two or more of headings 8202 to 8205, put up in sets for retail sale (pcs): General The rate of duty applicable to that article in the set subject to the highest rate of duty; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 The rate of duty applicable to that article in the set subject to the highest rate of duty.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.