HTS Heading 8211

Knives with cutting blades, serrated or not (including pruning knives), other than knives of heading 8208, and blades and other base metal parts thereof

All 25 HTS codes under heading 8211 (knives with cutting), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10.6%, some per unit.

Every line of heading 8211

  • 8211 Knives with cutting blades, serrated or not (including pruning knives), other than knives of heading 8208, and blades and other base metal parts thereof.
  • 8211.10.00.00 Sets of assorted articles (under: Knives with cutting blades, serrated or not (including pruning knives), other than knives of heading 8208, and blades and other base metal parts thereof) (pcs): General The rate of duty applicable to that article in the set subject to the highest rate of duty; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 The rate of duty appli- cable to that article in the set subject to the high- est rate of duty.
  • 8211.91 Table knives having fixed blades.
  • 8211.91.10.00 Knives with silver-plated handles (No.): General Free; Special none; Column 2 8¢ each + 45%.
  • 8211.91.20.00 Valued under 25¢ each, not over 25.9 cm in overall length (pcs): General 0.4¢ each + 6.4%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA, PE,S,SG); Column 2 2¢ each + 45%.
  • 8211.91.25.00 Other (under: With handles containing nickel or containing over 10 percent by weight of manganese) (pcs): General 0.4¢ each + 6.8%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 2¢ each + 45%.
  • 8211.91.30.00 Valued under 25¢ each, not over 25.9 cm in overall length (pcs): General 0.9¢ each + 10.6%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 2¢ each + 45%.
  • 8211.91.40.00 Other (under: Other) (pcs): General 0.3¢ each + 3.7%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 2¢ each + 45%.
  • 8211.91.50 Knives with rubber or plastic handles: General 0.7¢ each + 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
  • 8211.91.50.30 Steak knives (under: Knives with rubber or plastic handles) (No.).
  • 8211.91.50.60 Other (under: Knives with rubber or plastic handles) (No.).
  • 8211.91.80 Other (under: Table knives having fixed blades): General 0.3¢ each + 4.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
  • 8211.91.80.30 Steak knives (under: Other) (No.).
  • 8211.91.80.60 Other (under: Other) (No.).
  • 8211.92 Other knives having fixed blades.
  • 8211.92.20.00 Kitchen and butcher knives (under: With rubber or plastic handles) (No.): General 0.8¢ each + 4.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
  • 8211.92.40 Other (under: With rubber or plastic handles): General 1¢ each + 4.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
  • 8211.92.40.50 Sheath-type knives (under: Other) (No.).
  • 8211.92.40.60 Other (under: Other) (No.).
  • 8211.92.60.00 Hunting knives with wood handles (No.): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
  • 8211.92.90 Other (under: Other): General 0.4¢ each + 6.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
  • 8211.92.90.30 Kitchen and butcher knives (under: Other) (No.).
  • 8211.92.90.45 Sheath-type knives (under: Other) (No.).
  • 8211.92.90.60 Other (under: Other) (No.).
  • 8211.93.00 Knives having other than fixed blades: General 3¢ each + 5.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35¢ each + 55%.
  • 8211.93.00.31 Folding two-handled multi-use tools in which one or more tools are housed in each handle and one or more of the tools is a folding knife blade (No.).
  • 8211.93.00.35 Pen knives, pocket knives and other knives which have folding blades (No.).
  • 8211.93.00.60 Other (including parts) (under: Knives having other than fixed blades) (No.).
  • 8211.94 Blades (under: Other).
  • 8211.94.10.00 For knives having fixed blades (No.): General 0.16¢ each + 2.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
  • 8211.94.50.00 Other (under: Blades) (No.): General 1¢ each + 5.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11¢ each + 55%.
  • 8211.95 Handles of base metal (under: Other).
  • 8211.95.10.00 For table knives having fixed blades (No.): General 0.3¢ each + 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
  • 8211.95.50.00 For other knives having fixed blades (No.): General 0.4¢ each + 6.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
  • 8211.95.90.00 Other (under: Handles of base metal) (No.): General 3¢ each + 5.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35¢ each + 55%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.