HTS Heading 8212
Razors and razor blades (including razor blade blanks in strips), and base metal parts thereof
All 4 HTS codes under heading 8212 (razors and razor blades), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8212
- 8212 Razors and razor blades (including razor blade blanks in strips), and base metal parts thereof.
- 8212.10.00.00 Razors (under: Razors and razor blades (including razor blade blanks in strips), and base metal parts thereof) (No.): General Free; Special none; Column 2 10¢ each + 30%.
- 8212.20.00 Safety razor blades, including razor blade blanks in strips: General Free; Special none; Column 2 1¢ each + 30%.
- 8212.20.00.05 Single edge razor blades for shaving (No.).
- 8212.20.00.10 Other (under: Safety razor blades, including razor blade blanks in strips) (No.).
- 8212.90.00.00 Other parts (under: Razors and razor blades (including razor blade blanks in strips), and base metal parts thereof) (No.): General Free; Special none; Column 2 27.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.