HTS Heading 8214
Other articles of cutlery (for example, hair clippers, butchers' or kitchen cleavers, chopping or mincing knives, paper knives); manicure or pedicure sets and instruments (including nail files); base metal parts thereof
All 7 HTS codes under heading 8214 (other articles of cutlery), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.9%, some per unit.
Every line of heading 8214
- 8214 Other articles of cutlery (for example, hair clippers, butchers' or kitchen cleavers, chopping or mincing knives, paper knives); manicure or pedicure sets and instruments (including nail files); base metal parts thereof.
- 8214.10.00.00 Paper knives, letter openers, erasing knives, pencil sharpeners (nonmechanical) and blades and other parts thereof (No.): General 0.3¢ each + 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
- 8214.20 Manicure or pedicure sets and instruments (including nail files), and parts thereof.
- 8214.20.30.00 Cuticle or cornknives, cuticle pushers, nail files, nailcleaners, nail nippers and clippers, all the foregoing used for manicure or pedicure purposes, and parts thereof (No.): General 4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 8214.20.60.00 In leather containers (under: Manicure and pedicure sets, and combinations thereof) (No.): General Free; Special none; Column 2 50%.
- 8214.20.90.00 Other (under: Manicure and pedicure sets, and combinations thereof) (No.): General 4.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8214.90 Other (under: Other articles of cutlery (for example, hair clippers, butchers' or kitchen cleavers, chopping or mincing knives, paper knives); manicure or pedicure sets and instruments (including nail files); base metal parts thereof).
- 8214.90.30.00 Cleavers with their handles (under: Cleavers and the like not elsewhere specified or included) (No.): General 1¢ each + 4.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
- 8214.90.60.00 Other (under: Cleavers and the like not elsewhere specified or included) (No.): General 0.2¢ each + 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8¢ each + 45%.
- 8214.90.90.00 Other (including parts) (under: Other) (No.): General 1.4¢ each + 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20¢ each + 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.