HTS Heading 8213

Scissors, tailors' shears and similar shears, and blades and other base metal parts thereof

All 3 HTS codes under heading 8213 (scissors), with their duty rates from the 2026 HTS Revision 23. General duty 3% to 8%, some per unit.

Every line of heading 8213

  • 8213.00 Scissors, tailors' shears and similar shears, and blades and other base metal parts thereof.
  • 8213.00.30.00 Valued not over $1.75/dozen (under: Scissors, tailors' shears and similar shears, and blades and other base metal parts thereof) (No.): General 1.7¢ each + 4.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15¢ each + 45%.
  • 8213.00.60.00 Pinking shears, valued over $30/dozen (No.): General 8¢ each + 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20¢ each + 45%.
  • 8213.00.90.00 Other (including parts) (under: Valued over $1.75/dozen) (No.): General 3¢ each + 3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20¢ each + 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.