HTS Heading 8309
Stoppers, caps and lids (including crown corks, screw caps and pouring stoppers), capsules for bottles, threaded bungs, bung covers, seals and other packing accessories, and parts thereof, of base metal
All 5 HTS codes under heading 8309 (stoppers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.6%.
Every line of heading 8309
- 8309 Stoppers, caps and lids (including crown corks, screw caps and pouring stoppers), capsules for bottles, threaded bungs, bung covers, seals and other packing accessories, and parts thereof, of base metal.
- 8309.10.00.00 Crown corks (including crown seals and caps), and parts thereof (kg): General Free; Special none; Column 2 45%.
- 8309.90.00 Other (under: Stoppers, caps and lids (including crown corks, screw caps and pouring stoppers), capsules for bottles, threaded bungs, bung covers, seals and other packing accessories, and parts thereof, of base metal): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8309.90.00.20 For cans of a kind used for the conveyance of beverages as described in statistical note 2 to this chapter (kg, No.).
- 8309.90.00.25 Other (under: Of aluminum) (kg, No.).
- 8309.90.00.80 Of steel (under: Other) (kg, No.).
- 8309.90.00.85 Other (under: Other) (kg, No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.