HTS Chapter 83
Miscellaneous articles of base metal
The 11 headings and 89 HTS codes of chapter 83 (miscellaneous articles of base metal), with their duty rates from the 2026 HTS Revision 23.
The 11 headings of chapter 83
- 8301: Padlocks and locks (key, combination or electrically operated), of base metal; clasps and frames with clasps, incorporating locks, of base metal; keys and parts of any of the foregoing articles, of base metal (19 codes, General duty 2.3% to 6.1%)
- 8302: Base metal mountings, fittings and similar articles suitable for furniture, doors, staircases, windows, blinds, coachwork, saddlery, trunks, chests, caskets or the like; base metal hat racks, hat-pegs, brackets and similar fixtures; castors with mountings of base metal; automatic door closers of base metal; and base metal parts thereof (36 codes, General duty Free to 7.5%)
- 8303: Armored or reinforced safes, strong-boxes and doors and safe deposit lockers for strong-rooms, cash or deed boxes and the like, and parts thereof, of base metal (1 code, General duty 3.8%)
- 8304: Desk-top filing or card-index cabinets, paper trays, paper rests, pen trays, office-stamp stands and similar office or desk equipment and parts thereof, of base metal, other than office furniture of heading 9403 (1 code, General duty 3.9%)
- 8305: Fittings for looseleaf binders or files, letter clips, letter corners, paper clips, indexing tags and similar office articles, and parts thereof, of base metal; staples in strips (for example, for offices, upholstery, packaging), of base metal (6 codes, General duty Free to 5.7%)
- 8306: Bells, gongs and the like, nonelectric, of base metal; statuettes and other ornaments, of base metal; photograph, picture or similar frames, of base metal; mirrors of base metal; and base metal parts thereof (4 codes, General duty Free to 5.8%)
- 8307: Flexible tubing of base metal, with or without fittings (5 codes, General duty 3.8%)
- 8308: Clasps, frames with clasps, buckles, buckle-clasps, hooks, eyes, eyelets and the like, of base metal, of a kind used for clothing or clothing accessories, footwear, jewelry, wrist watches, books, awnings, leather goods, travel goods or saddlery or for other made up articles; tubular or bifurcated rivets, of base metal; beads and spangles, of base metal (6 codes, General duty Free to 3.9%, some per unit)
- 8309: Stoppers, caps and lids (including crown corks, screw caps and pouring stoppers), capsules for bottles, threaded bungs, bung covers, seals and other packing accessories, and parts thereof, of base metal (5 codes, General duty Free to 2.6%)
- 8310: Sign plates, name plates, address plates and similar plates, numbers, letters and other symbols, and parts thereof, of base metal, excluding those of heading 9405 (1 code, General duty Free)
- 8311: Wire, rods, tubes, plates, electrodes and similar products of base metal or of metal carbides, coated or cored with flux material, of a kind used for soldering, brazing, welding or deposition of metal or of metal carbides; wire and rods, of agglomerated base metal powder, used for metal spraying; base metal parts thereof (5 codes, General duty Free)
Where it sits in the schedule
Chapter 83 is in Section XV of the Harmonized System, base metals and their articles (chapters 72 to 83). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.