HTS Heading 8311

Wire, rods, tubes, plates, electrodes and similar products of base metal or of metal carbides, coated or cored with flux material, of a kind used for soldering, brazing, welding or deposition of metal or of metal carbides; wire and rods, of agglomerated base metal powder, used for metal spraying; base metal parts thereof

All 5 HTS codes under heading 8311 (wire, rods, tubes, plates), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8311

  • 8311 Wire, rods, tubes, plates, electrodes and similar products of base metal or of metal carbides, coated or cored with flux material, of a kind used for soldering, brazing, welding or deposition of metal or of metal carbides; wire and rods, of agglomerated base metal powder, used for metal spraying; base metal parts thereof.
  • 8311.10.00.00 Coated electrodes of base metal, for electric arc-welding (kg): General Free; Special none; Column 2 35%.
  • 8311.20.00.00 Cored wire of base metal, for electric arc-welding (kg): General Free; Special none; Column 2 35%.
  • 8311.30 Coated rods and cored wire, of base metal, for soldering, brazing or welding by flame.
  • 8311.30.30.00 Lead-tin solders (under: Coated rods and cored wire, of base metal, for soldering, brazing or welding by flame) (kg, Pb kg): General Free; Special none; Column 2 2.5¢/kg on lead content.
  • 8311.30.60.00 Other (under: Coated rods and cored wire, of base metal, for soldering, brazing or welding by flame) (kg): General Free; Special none; Column 2 35%.
  • 8311.90.00.00 Other (under: Wire, rods, tubes, plates, electrodes and similar products of base metal or of metal carbides, coated or cored with flux material, of a kind used for soldering, brazing, welding or deposition of metal or of metal carbides; wire and rods, of agglomerated base metal powder, used for metal spraying; base metal parts thereof) (kg): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.