HTS Heading 8418
Refrigerators, freezers and other refrigerating or freezing equipment, electric or other; heat pumps, other than the air conditioning machines of heading 8415; parts thereof
All 36 HTS codes under heading 8418 (refrigerators), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.9%.
Every line of heading 8418
- 8418 Refrigerators, freezers and other refrigerating or freezing equipment, electric or other; heat pumps, other than the air conditioning machines of heading 8415; parts thereof.
- 8418.10.00 Combined refrigerator-freezers, fitted with separate external doors or drawers, or combinations thereof: General Free; Special none; Column 2 35%.
- 8418.10.00.10 Having a refrigerated volume of under 184 liters (No.).
- 8418.10.00.20 Having a refrigerated volume of 184 liters and over but under 269 liters (No.).
- 8418.10.00.30 Having a refrigerated volume of 269 liters and over but under 382 liters (No.).
- 8418.10.00.45 Having an external depth (excluding door handles) not exceeding 73 centimeters (No.).
- 8418.10.00.55 Other (under: Of a width exceeding 87 centimeters but not exceeding 95 centimeters) (No.).
- 8418.10.00.65 Other (under: French door refrigerators with a bottom freezer compartment) (No.).
- 8418.10.00.80 Refrigerators with a top freezer compartment (No.).
- 8418.10.00.85 Other (under: Having a refrigerated volume of 382 liters and over) (No.).
- 8418.10.00.90 Other (under: Combined refrigerator-freezers, fitted with separate external doors or drawers, or combinations thereof) (No.).
- 8418.21.00 Compression type (under: Refrigerators, household type): General Free; Special none; Column 2 35%.
- 8418.21.00.10 Having a refrigerated volume of under 184 liters (No.).
- 8418.21.00.20 Having a refrigerated volume of 184 liters and over but under 269 liters (No.).
- 8418.21.00.30 Having a refrigerated volume of 269 liters and over but under 382 liters (No.).
- 8418.21.00.90 Having a refrigerated volume of 382 liters and over (No.).
- 8418.29 Other (under: Refrigerators, household type).
- 8418.29.10.00 Absorption type, electrical (under: Other) (No.): General 1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8418.29.20.00 Other (under: Other) (No.): General 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8418.30.00.00 Freezers of the chest type, not exceeding 800 liters capacity (No.): General Free; Special none; Column 2 35%.
- 8418.40.00.00 Freezers of the upright type, not exceeding 900 liters capacity (No.): General Free; Special none; Column 2 35%.
- 8418.50.00 Other furniture (chests, cabinets, display counters, show-cases and the like) for storage and display, incorporating refrigerating or freezing equipment: General Free; Special none; Column 2 35%.
- 8418.50.00.40 Freezing (under: Other furniture (chests, cabinets, display counters, show-cases and the like) for storage and display, incorporating refrigerating or freezing equipment) (No.).
- 8418.50.00.80 Other (under: Other furniture (chests, cabinets, display counters, show-cases and the like) for storage and display, incorporating refrigerating or freezing equipment) (No.).
- 8418.61.01.00 Heat pumps other than air conditioning machines of heading 8415 (No.): General Free; Special none; Column 2 35%.
- 8418.69.01 Other (under: Other refrigerating or freezing equipment; heat pumps): General Free; Special none; Column 2 35%.
- 8418.69.01.10 Icemaking machines (under: Other) (No.).
- 8418.69.01.20 Drinking water coolers, self-contained (No.).
- 8418.69.01.30 Soda fountain and beer dispensing equipment (No.).
- 8418.69.01.40 Centrifugal liquid chilling refrigerating units (No.).
- 8418.69.01.50 Reciprocating liquid chilling refrigerating units (No.).
- 8418.69.01.60 Absorption liquid chilling units (No.).
- 8418.69.01.80 Other refrigerating or freezing equipment (No.).
- 8418.91.00.00 Furniture designed to receive refrigerating or freezing equipment (No.): General Free; Special none; Column 2 35%.
- 8418.99 Other (under: Parts).
- 8418.99.40.00 Door assemblies incorporating more than one of the following: inner panel; outer panel; insulation; hinges; handles (No.): General Free; Special none; Column 2 35%.
- 8418.99.80 Other (under: Other): General Free; Special none; Column 2 35%.
- 8418.99.80.05 Not exceeding 746 W (under: Refrigeration condensing units) (No.).
- 8418.99.80.10 Exceeding 746 W but not exceeding 2.2 kW (No.).
- 8418.99.80.15 Exceeding 2.2 kW but not exceeding 7.5 kW (No.).
- 8418.99.80.20 Exceeding 7.5 kW but not exceeding 22.3 kW (No.).
- 8418.99.80.25 Exceeding 22.3 kW (under: Refrigeration condensing units) (No.).
- 8418.99.80.50 Parts of combined refrigerator-freezers fitted with separate external doors and parts of household type refrigerators (kg).
- 8418.99.80.60 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.