HTS Heading 8417

Industrial or laboratory furnaces and ovens, including incinerators, nonelectric, and parts thereof

All 4 HTS codes under heading 8417 (industrial or laboratory furnaces), with their duty rates from the 2026 HTS Revision 23. General duty 2.9% to 3.9%.

Every line of heading 8417

  • 8417 Industrial or laboratory furnaces and ovens, including incinerators, nonelectric, and parts thereof.
  • 8417.10.00.00 Furnaces and ovens for the roasting, melting or other heat treatment of ores, pyrites or of metals (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8417.20.00.00 Bakery ovens, including biscuit ovens (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8417.80.00.00 Other, except parts (under: Industrial or laboratory furnaces and ovens, including incinerators, nonelectric, and parts thereof) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8417.90.00.00 Parts (under: Industrial or laboratory furnaces and ovens, including incinerators, nonelectric, and parts thereof) (kg): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

From MFG Calcs data: Industrial furnaces and ovens

U.S. imports of industrial furnaces and ovens (headings 8417, 8514) came to $1.34B in 2025, with $129M in calculated duty: an effective duty of 9.7%, every duty included.

Effective duty in Sep 2026: 9.8%, against 19.9% in Sep 2025.

Largest sources in 2025: Germany $229M at 6.5% effective duty; China $171M at 29.5% effective duty; Japan $134M at 4.1% effective duty; Italy $121M at 7.8% effective duty; Canada $108M at 1.4% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.