HTS Heading 8422

Dishwashing machines; machinery for cleaning or drying bottles or other containers; machinery for filling, closing, sealing or labeling bottles, cans, boxes, bags or other containers; machinery for capsuling bottles, jars, tubes and similar containers; other packing or wrapping machinery (including heat-shrink wrapping machinery); machinery for aerating beverages; parts thereof

All 33 HTS codes under heading 8422 (dishwashing machines), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.4%.

Every line of heading 8422

  • 8422 Dishwashing machines; machinery for cleaning or drying bottles or other containers; machinery for filling, closing, sealing or labeling bottles, cans, boxes, bags or other containers; machinery for capsuling bottles, jars, tubes and similar containers; other packing or wrapping machinery (including heat-shrink wrapping machinery); machinery for aerating beverages; parts thereof.
  • 8422.11.00.00 Of the household type (under: Dishwashing machines) (No.): General 2.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8422.19.00.00 Other (under: Dishwashing machines) (No.): General Free; Special none; Column 2 35%.
  • 8422.20.00.00 Machinery for cleaning or drying bottles or other containers (No.): General Free; Special none; Column 2 35%.
  • 8422.30 Machinery for filling, closing, sealing or labeling bottles, cans, boxes, bags or other containers; machinery for capsuling bottles, jars, tubes and similar containers; machinery for aerating beverages.
  • 8422.30.11.00 Can-sealing machines (under: Machinery for filling, closing, sealing or labeling bottles, cans, boxes, bags or other containers; machinery for capsuling bottles, jars, tubes and similar containers; machinery for aerating beverages) (No.): General Free; Special none; Column 2 30%.
  • 8422.30.91 Other (under: Machinery for filling, closing, sealing or labeling bottles, cans, boxes, bags or other containers; machinery for capsuling bottles, jars, tubes and similar containers; machinery for aerating beverages): General Free; Special none; Column 2 35%.
  • 8422.30.91.10 Machines for aerating beverages (No.).
  • 8422.30.91.20 Labeling machines (under: Other) (No.).
  • 8422.30.91.30 Vacuum or gas packaging (under: Machines for filling, whether or not capable of performing other operations) (No.).
  • 8422.30.91.40 Other (under: Machines for filling, whether or not capable of performing other operations) (No.).
  • 8422.30.91.50 Vacuum or gas packaging (under: Machines which perform only the following operations: capping, lidding, sealing or closing) (No.).
  • 8422.30.91.60 Other (under: Machines which perform only the following operations: capping, lidding, sealing or closing) (No.).
  • 8422.30.91.70 Other (under: Machinery for filling, closing, sealing, capsuling or labeling bottles, cans or similar containers) (No.).
  • 8422.30.91.80 Machines for opening, filling and closing bags (No.).
  • 8422.30.91.85 Machines for forming, filling and sealing bags/pouches (No.).
  • 8422.30.91.86 Machines for opening, filling and closing boxes (No.).
  • 8422.30.91.87 Machines for skin and blister packaging (No.).
  • 8422.30.91.91 Other (under: Machinery for filling, closing, sealing, capsuling or labeling boxes, bags or similar containers) (No.).
  • 8422.40 Other packing or wrapping machinery (including heat-shrink wrapping machinery).
  • 8422.40.11 Machines for packaging pipe tobacco; machines for wrapping candy; machines for wrapping cigarette packages; and combination candy cutting and wrapping machines: General Free; Special none; Column 2 35%.
  • 8422.40.11.10 Machines for wrapping candy (under: Machines for packaging pipe tobacco; machines for wrapping candy; machines for wrapping cigarette packages; and combination candy cutting and wrapping machines) (No.).
  • 8422.40.11.90 Other (under: Machines for packaging pipe tobacco; machines for wrapping candy; machines for wrapping cigarette packages; and combination candy cutting and wrapping machines) (No.).
  • 8422.40.91 Other (under: Other packing or wrapping machinery (including heat-shrink wrapping machinery)): General Free; Special none; Column 2 35%.
  • 8422.40.91.40 Strapping machines (under: Other) (No.).
  • 8422.40.91.50 Machines for case and tray forming, packing, unpacking, closing and sealing (No.).
  • 8422.40.91.60 Machines for shrink film and heat sealing (No.).
  • 8422.40.91.70 Machines for wrapping (under: Other) (No.).
  • 8422.40.91.81 Other (under: Other) (No.).
  • 8422.90 Parts (under: Dishwashing machines; machinery for cleaning or drying bottles or other containers; machinery for filling, closing, sealing or labeling bottles, cans, boxes, bags or other containers; machinery for capsuling bottles, jars, tubes and similar containers; other packing or wrapping machinery (including heat-shrink wrapping machinery); machinery for aerating beverages; parts thereof).
  • 8422.90.02.00 Water containment chambers for the dishwashing machines of subheading 8422.11 and other parts of dishwashing machines of the household type incorporating water containment chambers (No.): General Free; Special none; Column 2 35%.
  • 8422.90.04.00 Door assemblies for the dishwashing machines of subheading 8422.11 (No.): General Free; Special none; Column 2 35%.
  • 8422.90.06 Other (under: Of dishwashing machines): General Free; Special none; Column 2 35%.
  • 8422.90.06.40 Of the household type (under: Other) (kg).
  • 8422.90.06.80 Other (under: Other) (kg).
  • 8422.90.11.00 Of can-sealing machines (under: Parts) (kg): General Free; Special none; Column 2 30%.
  • 8422.90.21.00 Of machines for packaging pipe tobacco, wrapping candy or wrapping cigarette packages, and of combination candy cutting and wrapping machines (kg): General Free; Special none; Column 2 35%.
  • 8422.90.91 Other (under: Parts): General Free; Special none; Column 2 35%.
  • 8422.90.91.20 Of machinery for cleaning or drying bottles or other containers (kg).
  • 8422.90.91.30 Of strapping machines (under: Other) (kg).
  • 8422.90.91.60 Of other wrapping and packaging machines (kg).
  • 8422.90.91.95 Other (under: Other) (kg).

From MFG Calcs data: Packaging and filling machinery

U.S. imports of packaging and filling machinery (heading 8422) came to $5.93B in 2025, with $549M in calculated duty: an effective duty of 9.3%, every duty included.

Effective duty in Sep 2026: 11.7%, against 15.4% in Sep 2025.

Largest sources in 2025: Germany $1.46B at 7.1% effective duty; Italy $1.16B at 8.1% effective duty; Canada $630M at 0.8% effective duty; China $340M at 41.9% effective duty; South Korea $306M at 9.3% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.