HTS Heading 8423
Weighing machinery (excluding balances of a sensitivity of 5 cg or better), including weight-operated counting or checking machines; weighing machine weights of all kinds; parts of weighing machinery
All 17 HTS codes under heading 8423 (weighing machinery), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.9%.
Every line of heading 8423
- 8423 Weighing machinery (excluding balances of a sensitivity of 5 cg or better), including weight-operated counting or checking machines; weighing machine weights of all kinds; parts of weighing machinery.
- 8423.10.00 Personal weighing machines, including baby scales; household scales: General Free; Special none; Column 2 45%.
- 8423.10.00.10 Digital electronic type (under: Personal weighing machines, including baby scales; household scales) (No.).
- 8423.10.00.30 Of a kind suitable for carrying on the person (No.).
- 8423.10.00.60 Other (under: Other) (No.).
- 8423.20 Scales for continuous weighing of goods on conveyors.
- 8423.20.10.00 Using electronic means for gauging weights (No.): General Free; Special none; Column 2 45%.
- 8423.20.90.00 Other (under: Scales for continuous weighing of goods on conveyors) (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8423.30.00.00 Constant-weight scales and scales for discharging a predetermined weight of material into a bag or container, including hopper scales (No.): General Free; Special none; Column 2 45%.
- 8423.81.00 Having a maximum weighing capacity not exceeding 30 kg: General Free; Special none; Column 2 45%.
- 8423.81.00.10 Counting scales (under: Digital electronic type) (No.).
- 8423.81.00.20 Retail scales, non-computing (under: Digital electronic type) (No.).
- 8423.81.00.30 Retail scales, computing (under: Digital electronic type) (No.).
- 8423.81.00.40 Other (under: Digital electronic type) (No.).
- 8423.81.00.50 Other (under: Having a maximum weighing capacity not exceeding 30 kg) (No.).
- 8423.82.00 Having a maximum weighing capacity exceeding 30 kg but not exceeding 5,000 kg: General Free; Special none; Column 2 45%.
- 8423.82.00.10 Digital electronic type (under: Having a maximum weighing capacity exceeding 30 kg but not exceeding 5,000 kg) (No.).
- 8423.82.00.50 Other (under: Having a maximum weighing capacity exceeding 30 kg but not exceeding 5,000 kg) (No.).
- 8423.89 Other (under: Other weighing machinery).
- 8423.89.10.00 Using electronic means for gauging (No.): General Free; Special none; Column 2 45%.
- 8423.89.90.00 Other (under: Other) (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8423.90 Weighing machine weights of all kinds; parts of weighing machinery.
- 8423.90.10.00 Parts of weighing machinery using electronic means for gauging weight, excluding parts of machines for weighing motor vehicles (kg): General Free; Special none; Column 2 45%.
- 8423.90.90.00 Other (under: Weighing machine weights of all kinds; parts of weighing machinery) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.