HTS Heading 8434
Milking machines and dairy machinery, and parts thereof
All 3 HTS codes under heading 8434 (milking machines and dairy machinery), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8434
- 8434 Milking machines and dairy machinery, and parts thereof.
- 8434.10.00.00 Milking machines (under: Milking machines and dairy machinery, and parts thereof) (No.): General Free; Special none; Column 2 Free.
- 8434.20.00.00 Dairy machinery (under: Milking machines and dairy machinery, and parts thereof) (No.): General Free; Special none; Column 2 Free.
- 8434.90.00.00 Parts (under: Milking machines and dairy machinery, and parts thereof) (No.): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.