HTS Heading 8433

Harvesting or threshing machinery, including straw or fodder balers; grass or hay mowers; machines for cleaning, sorting or grading eggs, fruit or other agricultural produce, other than machinery of heading 8437; parts thereof

All 31 HTS codes under heading 8433 (harvesting or threshing machinery), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8433

  • 8433 Harvesting or threshing machinery, including straw or fodder balers; grass or hay mowers; machines for cleaning, sorting or grading eggs, fruit or other agricultural produce, other than machinery of heading 8437; parts thereof.
  • 8433.11.00 Powered, with the cutting device rotating in a horizontal plane: General Free; Special none; Column 2 30%.
  • 8433.11.00.10 Electric mowers, including battery operated (No.).
  • 8433.11.00.20 Under 5.2 kW (under: Riding mowers, other than electric) (No.).
  • 8433.11.00.30 5.2 kW and over but under 7.46 kW (No.).
  • 8433.11.00.40 7.46 kW and over (under: Riding mowers, other than electric) (No.).
  • 8433.11.00.50 Under 3.7 kW (under: Other) (No.).
  • 8433.11.00.60 3.7 kW and over (under: Other) (No.).
  • 8433.19.00 Other (under: Mowers for lawns, parks or sports grounds): General Free; Special none; Column 2 30%.
  • 8433.19.00.10 Greens mowers (under: Other) (No.).
  • 8433.19.00.20 Gang cutting units (under: Other) (No.).
  • 8433.19.00.30 Other riding mowers (under: Other) (No.).
  • 8433.19.00.40 Gasoline powered (under: Other) (No.).
  • 8433.19.00.50 Other (under: Other) (No.).
  • 8433.20.00 Other mowers, including cutter bars for tractor mounting: General Free; Special none; Column 2 Free.
  • 8433.20.00.20 Rotary cutter type (under: Tractor drawn or for tractor mounting) (No.).
  • 8433.20.00.40 Other (under: Tractor drawn or for tractor mounting) (No.).
  • 8433.20.00.60 Other (under: Other mowers, including cutter bars for tractor mounting) (No.).
  • 8433.30.00.00 Other haymaking machinery (under: Harvesting or threshing machinery, including straw or fodder balers; grass or hay mowers; machines for cleaning, sorting or grading eggs, fruit or other agricultural produce, other than machinery of heading 8437; parts thereof) (No.): General Free; Special none; Column 2 Free.
  • 8433.40.00.00 Straw or fodder balers, including pick-up balers (No.): General Free; Special none; Column 2 Free.
  • 8433.51.00 Combine harvester-threshers (under: Other harvesting machinery; threshing machinery): General Free; Special none; Column 2 Free.
  • 8433.51.00.10 Self-propelled (under: Combine harvester-threshers) (No.).
  • 8433.51.00.90 Other (under: Combine harvester-threshers) (No.).
  • 8433.52.00.00 Other threshing machinery (under: Other harvesting machinery; threshing machinery) (No.): General Free; Special none; Column 2 Free.
  • 8433.53.00.00 Root or tuber harvesting machines (No.): General Free; Special none; Column 2 Free.
  • 8433.59.00 Other (under: Other harvesting machinery; threshing machinery): General Free; Special none; Column 2 Free.
  • 8433.59.00.10 Field forage harvesters (under: Other) (No.).
  • 8433.59.00.90 Other (under: Other) (No.).
  • 8433.60.00 Machines for cleaning, sorting or grading eggs, fruit or other agricultural produce: General Free; Special none; Column 2 Free.
  • 8433.60.00.10 Machines for cleaning, sorting or grading eggs (No.).
  • 8433.60.00.90 Other (under: Machines for cleaning, sorting or grading eggs, fruit or other agricultural produce) (No.).
  • 8433.90 Parts (under: Harvesting or threshing machinery, including straw or fodder balers; grass or hay mowers; machines for cleaning, sorting or grading eggs, fruit or other agricultural produce, other than machinery of heading 8437; parts thereof).
  • 8433.90.10 Of mowers for lawns, parks or sports grounds: General Free; Special none; Column 2 30%.
  • 8433.90.10.10 Wheel and tire assemblies (under: Of mowers for lawns, parks or sports grounds) (No.).
  • 8433.90.10.90 Other (under: Of mowers for lawns, parks or sports grounds) (No.).
  • 8433.90.50 Other (under: Parts): General Free; Special none; Column 2 Free.
  • 8433.90.50.10 Road wheels (under: Of other mowers, harvesting machines and threshing machines) (No.).
  • 8433.90.50.25 Of haying machines and balers (No.).
  • 8433.90.50.45 Other (under: Of other mowers, harvesting machines and threshing machines) (No.).
  • 8433.90.50.60 Of machines for cleaning, sorting or grading eggs (No.).
  • 8433.90.50.80 Of machines for cleaning, sorting or grading fruit or other agricultural produce (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.