HTS Heading 8437

Machines for cleaning, sorting or grading seed, grain or dried leguminous vegetables, and parts thereof; machinery used in the milling industry or for the working of cereals or dried leguminous vegetables, other than farm type machinery; parts thereof

All 5 HTS codes under heading 8437 (machines for cleaning, sorting or grading seed), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8437

  • 8437 Machines for cleaning, sorting or grading seed, grain or dried leguminous vegetables, and parts thereof; machinery used in the milling industry or for the working of cereals or dried leguminous vegetables, other than farm type machinery; parts thereof.
  • 8437.10.00.00 Machines for cleaning, sorting or grading seed, grain or dried leguminous vegetables (No.): General Free; Special none; Column 2 35%.
  • 8437.80.00 Other machinery (under: Machines for cleaning, sorting or grading seed, grain or dried leguminous vegetables, and parts thereof; machinery used in the milling industry or for the working of cereals or dried leguminous vegetables, other than farm type machinery; parts thereof): General Free; Special none; Column 2 35%.
  • 8437.80.00.10 Flour mill and grain mill machines (No.).
  • 8437.80.00.90 Other (under: Other machinery) (No.).
  • 8437.90.00 Parts (under: Machines for cleaning, sorting or grading seed, grain or dried leguminous vegetables, and parts thereof; machinery used in the milling industry or for the working of cereals or dried leguminous vegetables, other than farm type machinery; parts thereof): General Free; Special none; Column 2 35%.
  • 8437.90.00.10 Of flour mill or grain mill machines (No.).
  • 8437.90.00.90 Other (under: Parts) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.