HTS Heading 8438
Machinery, not specified or included elsewhere in this chapter, for the industrial preparation or manufacture of food or drink, other than machinery for the extraction or preparation of animal or fixed vegetable or microbial fats or oils; parts thereof
All 14 HTS codes under heading 8438 (machinery), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.8%.
Every line of heading 8438
- 8438 Machinery, not specified or included elsewhere in this chapter, for the industrial preparation or manufacture of food or drink, other than machinery for the extraction or preparation of animal or fixed vegetable or microbial fats or oils; parts thereof.
- 8438.10.00 Bakery machinery and machinery for the manufacture of macaroni, spaghetti or similar products: General Free; Special none; Column 2 35%.
- 8438.10.00.10 Bakery machinery (under: Bakery machinery and machinery for the manufacture of macaroni, spaghetti or similar products) (No.).
- 8438.10.00.90 Other (under: Bakery machinery and machinery for the manufacture of macaroni, spaghetti or similar products) (No.).
- 8438.20.00.00 Machinery for the manufacture of confectionery, cocoa or chocolate (No.): General Free; Special none; Column 2 35%.
- 8438.30.00.00 Machinery for sugar manufacture (No.): General Free; Special none; Column 2 Free.
- 8438.40.00.00 Brewery machinery (under: Machinery, not specified or included elsewhere in this chapter, for the industrial preparation or manufacture of food or drink, other than machinery for the extraction or preparation of animal or fixed vegetable or microbial fats or oils; parts thereof) (No.): General 2.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8438.50.00 Machinery for the preparation of meat or poultry: General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8438.50.00.10 Meat- and poultry-packing plant machinery (No.).
- 8438.50.00.90 Other (under: Machinery for the preparation of meat or poultry) (No.).
- 8438.60.00.00 Machinery for the preparation of fruits, nuts or vegetables (No.): General Free; Special none; Column 2 35%.
- 8438.80.00.00 Other machinery (under: Machinery, not specified or included elsewhere in this chapter, for the industrial preparation or manufacture of food or drink, other than machinery for the extraction or preparation of animal or fixed vegetable or microbial fats or oils; parts thereof) (No.): General Free; Special none; Column 2 40%.
- 8438.90 Parts (under: Machinery, not specified or included elsewhere in this chapter, for the industrial preparation or manufacture of food or drink, other than machinery for the extraction or preparation of animal or fixed vegetable or microbial fats or oils; parts thereof).
- 8438.90.10.00 Of machinery for sugar manufacture (No.): General Free; Special none; Column 2 Free.
- 8438.90.90 Other (under: Parts): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8438.90.90.15 Of bakery machinery and machinery for the manufacture of macaroni, spaghetti or similar products (No.).
- 8438.90.90.30 Of machinery for the manufacture of confectionery, cocoa or chocolate (No.).
- 8438.90.90.60 Of machinery for the preparation of meat or poultry (No.).
- 8438.90.90.90 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.