HTS Heading 8448
Auxiliary machinery for use with machines of heading 8444, 8445, 8446 or 8447 (for example, dobbies, Jacquards, automatic stop motions and shuttle changing mechanisms); parts and accessories suitable for use solely or principally with the machines of this heading or of heading 8444, 8445, 8446 or 8447 (for example, spindles and spindle flyers, card clothing, combs, extruding nipples, shuttles, healds and heald-frames, hosiery needles)
All 21 HTS codes under heading 8448 (auxiliary machinery for use), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.
Every line of heading 8448
- 8448 Auxiliary machinery for use with machines of heading 8444, 8445, 8446 or 8447 (for example, dobbies, Jacquards, automatic stop motions and shuttle changing mechanisms); parts and accessories suitable for use solely or principally with the machines of this heading or of heading 8444, 8445, 8446 or 8447 (for example, spindles and spindle flyers, card clothing, combs, extruding nipples, shuttles, healds and heald-frames, hosiery needles).
- 8448.11.00.00 Dobbies and Jacquards; card reducing, copying, punching or assembling machines for use therewith (No.): General Free; Special none; Column 2 40%.
- 8448.19.00.00 Other (under: Auxiliary machinery for machines of heading 8444, 8445, 8446 or 8447) (No.): General Free; Special none; Column 2 40%.
- 8448.20 Parts and accessories of machines of heading 8444 or of their auxiliary machinery.
- 8448.20.10.00 Of machines for extruding or drawing man-made textile filaments (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8448.20.50 Other (under: Parts and accessories of machines of heading 8444 or of their auxiliary machinery): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8448.20.50.10 Of texturing machines (under: Other) (No.).
- 8448.20.50.90 Other (under: Other) (No.).
- 8448.31.00.00 Card clothing (under: Parts and accessories of machines of heading 8445 or of their auxiliary machinery) (m2): General 3.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8448.32.00 Of machines for preparing textile fibers, other than card clothing: General Free; Special none; Column 2 40%.
- 8448.32.00.10 Of cotton gins (under: Of machines for preparing textile fibers, other than card clothing) (No.).
- 8448.32.00.90 Other (under: Of machines for preparing textile fibers, other than card clothing) (No.).
- 8448.33.00.00 Spindles, spindle flyers, spinning rings and ring travellers (No.): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8448.39 Other (under: Parts and accessories of machines of heading 8445 or of their auxiliary machinery).
- 8448.39.10.00 Parts of spinning, doubling or twisting machines (No.): General Free; Special none; Column 2 40%.
- 8448.39.50.00 Parts of winding or reeling machines (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8448.39.90.00 Other (under: Other) (No.): General Free; Special none; Column 2 40%.
- 8448.42.00.00 Reeds for looms, healds and heald-frames (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8448.49 Other (under: Parts and accessories of weaving machines (looms) or of their auxiliary machinery).
- 8448.49.10.00 Shuttles (under: Other) (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8448.49.20.00 Other (under: Other) (No.): General Free; Special none; Column 2 40%.
- 8448.51 Sinkers, needles and other articles used in forming stitches.
- 8448.51.10.00 Latch needles (under: Needles for knitting machines) (thousands): General Free; Special none; Column 2 $2/1,000 + 60%.
- 8448.51.20.00 Spring-beard needles (under: Needles for knitting machines) (thousands): General Free; Special none; Column 2 $1.50/1,000 + 50%.
- 8448.51.30.00 Other (under: Needles for knitting machines) (thousands): General Free; Special none; Column 2 $1.15/1,000 + 40%.
- 8448.51.50.00 Other (under: Sinkers, needles and other articles used in forming stitches) (No.): General Free; Special none; Column 2 40%.
- 8448.59 Other (under: Parts and accessories of machines of heading 8447 or of their auxiliary machinery).
- 8448.59.10.00 Parts of knitting machines (under: Other) (No.): General Free; Special none; Column 2 40%.
- 8448.59.50.00 Other (under: Other) (No.): General Free; Special none; Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.