HTS Heading 8447
Knitting machines, stitch-bonding machines and machines for making gimped yarn, tulle, lace, embroidery, trimmings, braid or net and machines for tufting
All 15 HTS codes under heading 8447 (knitting machines), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.6%.
Every line of heading 8447
- 8447 Knitting machines, stitch-bonding machines and machines for making gimped yarn, tulle, lace, embroidery, trimmings, braid or net and machines for tufting.
- 8447.11 With cylinder diameter not exceeding 165 mm.
- 8447.11.10.00 For knitting hosiery (under: With cylinder diameter not exceeding 165 mm) (No.): General Free; Special none; Column 2 40%.
- 8447.11.90 Other (under: With cylinder diameter not exceeding 165 mm): General Free; Special none; Column 2 40%.
- 8447.11.90.10 Open-top cylinder machines (under: Other) (No.).
- 8447.11.90.20 Cylinder and dial machines (under: Other) (No.).
- 8447.11.90.90 Other (under: Other) (No.).
- 8447.12 With cylinder diameter exceeding 165 mm.
- 8447.12.10.00 For knitting hosiery (under: With cylinder diameter exceeding 165 mm) (No.): General Free; Special none; Column 2 40%.
- 8447.12.90 Other (under: With cylinder diameter exceeding 165 mm): General Free; Special none; Column 2 40%.
- 8447.12.90.10 Open-top cylinder machines (under: Other) (No.).
- 8447.12.90.20 Cylinder and dial machines (under: Other) (No.).
- 8447.12.90.90 Other (under: Other) (No.).
- 8447.20 Flat knitting machines; stitch-bonding machines.
- 8447.20.20.00 Power driven flat knitting machines over 50.8 cm in width (No.): General Free; Special none; Column 2 40%.
- 8447.20.30.00 Other (under: V-bed flat knitting machines) (No.): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8447.20.40.00 Warp knitting machines (under: Flat knitting machines; stitch-bonding machines) (No.): General Free; Special none; Column 2 40%.
- 8447.20.60.00 Other (under: Flat knitting machines; stitch-bonding machines) (No.): General Free; Special none; Column 2 40%.
- 8447.90 Other (under: Knitting machines, stitch-bonding machines and machines for making gimped yarn, tulle, lace, embroidery, trimmings, braid or net and machines for tufting).
- 8447.90.10.00 Braiding and lace-braiding machines (No.): General Free; Special none; Column 2 40%.
- 8447.90.50.00 Embroidery machines (under: Other) (No.): General Free; Special none; Column 2 30%.
- 8447.90.90.00 Other (under: Other) (No.): General Free; Special none; Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.