HTS Heading 8450

Household- or laundry-type washing machines, including machines which both wash and dry; parts thereof

All 11 HTS codes under heading 8450 (household- or laundry-type washing machines), with their duty rates from the 2026 HTS Revision 23. General duty 1% to 2.6%.

Every line of heading 8450

  • 8450 Household- or laundry-type washing machines, including machines which both wash and dry; parts thereof.
  • 8450.11.00 Fully automatic machines (under: Machines, each of a dry linen capacity not exceeding 10 kg): General 1.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8450.11.00.10 Coin operated (under: Fully automatic machines) (No.).
  • 8450.11.00.40 Top Loading (under: Other) (No.).
  • 8450.11.00.80 Other (under: Other) (No.).
  • 8450.12.00.00 Other machines with built-in centrifugal dryer (No.): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8450.19.00.00 Other (under: Machines, each of a dry linen capacity not exceeding 10 kg) (No.): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8450.20.00 Machines, each of a dry linen capacity exceeding 10 kg: General 1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8450.20.00.10 Coin operated (under: Machines, each of a dry linen capacity exceeding 10 kg) (No.).
  • 8450.20.00.40 Top Loading (under: Other) (No.).
  • 8450.20.00.80 Other (under: Other) (No.).
  • 8450.90 Parts (under: Household- or laundry-type washing machines, including machines which both wash and dry; parts thereof).
  • 8450.90.20.00 Tubs and tub assemblies (under: Parts) (No.): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8450.90.40.00 Furniture designed to receive the machines of subheadings 8450.11 through 8450.20, inclusive (No.): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8450.90.60.00 Other (under: Parts) (No.): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.