HTS Heading 8451

Machinery (other than machines of heading 8450) for washing, cleaning, wringing, drying, ironing, pressing (including fusing presses), bleaching, dyeing, dressing, finishing, coating or impregnating textile yarns, fabrics or made up textile articles and machines for applying the paste to the base fabric or other support used in the manufacture of floor coverings such as linoleum; machines for reeling, unreeling, folding, cutting or pinking textile fabrics; parts thereof

All 14 HTS codes under heading 8451 (machinery), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.5%.

Every line of heading 8451

  • 8451 Machinery (other than machines of heading 8450) for washing, cleaning, wringing, drying, ironing, pressing (including fusing presses), bleaching, dyeing, dressing, finishing, coating or impregnating textile yarns, fabrics or made up textile articles and machines for applying the paste to the base fabric or other support used in the manufacture of floor coverings such as linoleum; machines for reeling, unreeling, folding, cutting or pinking textile fabrics; parts thereof.
  • 8451.10.00.00 Dry-cleaning machines (under: Machinery (other than machines of heading 8450) for washing, cleaning, wringing, drying, ironing, pressing (including fusing presses), bleaching, dyeing, dressing, finishing, coating or impregnating textile yarns, fabrics or made up textile articles and machines for applying the paste to the base fabric or other support used in the manufacture of floor coverings such as linoleum; machines for reeling, unreeling, folding, cutting or pinking textile fabrics; parts thereof) (No.): General Free; Special none; Column 2 35%.
  • 8451.21.00 Each of a dry linen capacity not exceeding 10 kg: General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8451.21.00.10 Coin operated (under: Each of a dry linen capacity not exceeding 10 kg) (No.).
  • 8451.21.00.90 Other (under: Each of a dry linen capacity not exceeding 10 kg) (No.).
  • 8451.29.00 Other (under: Drying machines): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8451.29.00.10 For drying made up articles (under: Other) (No.).
  • 8451.29.00.90 Other (under: Other) (No.).
  • 8451.30.00.00 Ironing machines and presses (including fusing presses) (No.): General Free; Special none; Column 2 35%.
  • 8451.40.00.00 Washing, bleaching or dyeing machines (No.): General 3.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8451.50.00.00 Machines for reeling, unreeling, folding, cutting or pinking textile fabrics (No.): General Free; Special none; Column 2 40%.
  • 8451.80.00.00 Other machinery (under: Machinery (other than machines of heading 8450) for washing, cleaning, wringing, drying, ironing, pressing (including fusing presses), bleaching, dyeing, dressing, finishing, coating or impregnating textile yarns, fabrics or made up textile articles and machines for applying the paste to the base fabric or other support used in the manufacture of floor coverings such as linoleum; machines for reeling, unreeling, folding, cutting or pinking textile fabrics; parts thereof) (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8451.90 Parts (under: Machinery (other than machines of heading 8450) for washing, cleaning, wringing, drying, ironing, pressing (including fusing presses), bleaching, dyeing, dressing, finishing, coating or impregnating textile yarns, fabrics or made up textile articles and machines for applying the paste to the base fabric or other support used in the manufacture of floor coverings such as linoleum; machines for reeling, unreeling, folding, cutting or pinking textile fabrics; parts thereof).
  • 8451.90.30.00 Drying chambers for the drying machines of subheading 8451.21 or 8451.29, and other parts of drying machines incorporating drying chambers (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8451.90.60.00 Furniture designed to receive the drying machines of subheading 8451.21 or 8451.29 (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8451.90.90 Other (under: Parts): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8451.90.90.10 Of machines for washing, dry-cleaning, ironing, pressing or drying made up textile articles or of other household or laundry type machines (No.).
  • 8451.90.90.20 Of machines for bleaching, dyeing, washing or cleaning (No.).
  • 8451.90.90.90 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.