HTS Heading 8453
Machinery for preparing, tanning or working hides, skins or leather or for making or repairing footwear or other articles of hides, skins or leather, other than sewing machines; parts thereof
All 5 HTS codes under heading 8453 (machinery for preparing, tanning or working hides), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8453
- 8453 Machinery for preparing, tanning or working hides, skins or leather or for making or repairing footwear or other articles of hides, skins or leather, other than sewing machines; parts thereof.
- 8453.10.00.00 Machinery for preparing, tanning or working hides, skins or leather (No.): General Free; Special none; Column 2 35%.
- 8453.20.00.00 Machinery for making or repairing footwear (No.): General Free; Special none; Column 2 Free.
- 8453.80.00.00 Other machinery (under: Machinery for preparing, tanning or working hides, skins or leather or for making or repairing footwear or other articles of hides, skins or leather, other than sewing machines; parts thereof) (No.): General Free; Special none; Column 2 35%.
- 8453.90 Parts (under: Machinery for preparing, tanning or working hides, skins or leather or for making or repairing footwear or other articles of hides, skins or leather, other than sewing machines; parts thereof).
- 8453.90.10.00 Of machinery for making or repairing footwear (No.): General Free; Special none; Column 2 Free.
- 8453.90.50.00 Other (under: Parts) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.