HTS Heading 8452

Sewing machines, other than book-sewing machines of heading 8440; furniture, bases and covers specially designed for sewing machines; sewing machine needles; parts thereof

All 10 HTS codes under heading 8452 (sewing machines), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.5%.

Every line of heading 8452

  • 8452 Sewing machines, other than book-sewing machines of heading 8440; furniture, bases and covers specially designed for sewing machines; sewing machine needles; parts thereof.
  • 8452.10.00 Sewing machines of the household type: General Free; Special none; Column 2 30%.
  • 8452.10.00.10 Valued not over $20 each (under: Sewing machines of the household type) (No.).
  • 8452.10.00.90 Other (under: Sewing machines of the household type) (No.).
  • 8452.21 Automatic units (under: Other sewing machines).
  • 8452.21.10.00 Specially designed to join footwear soles to uppers (No.): General Free; Special none; Column 2 Free.
  • 8452.21.90.00 Other (under: Automatic units) (No.): General Free; Special none; Column 2 30%.
  • 8452.29 Other (under: Other sewing machines).
  • 8452.29.10.00 Specially designed to join footwear soles to uppers (No.): General Free; Special none; Column 2 Free.
  • 8452.29.90.00 Other (under: Other) (No.): General Free; Special none; Column 2 30%.
  • 8452.30.00.00 Sewing machine needles (under: Sewing machines, other than book-sewing machines of heading 8440; furniture, bases and covers specially designed for sewing machines; sewing machine needles; parts thereof) (thousands): General Free; Special none; Column 2 42%.
  • 8452.90 Furniture, bases and covers for sewing machines, and parts thereof; other parts of sewing machines.
  • 8452.90.10.00 Furniture, bases and covers for sewing machines, and parts thereof (No.): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8452.90.20 Other parts of sewing machines: General Free; Special none; Column 2 30%.
  • 8452.90.20.10 Of household machines (under: Other parts of sewing machines) (No.).
  • 8452.90.20.90 Other (under: Other parts of sewing machines) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.