HTS Heading 8458
Lathes (including turning centers) for removing metal
All 22 HTS codes under heading 8458 (lathes (including turning centers)), with their duty rates from the 2026 HTS Revision 23. General duty 4.2% to 4.4%.
Every line of heading 8458
- 8458 Lathes (including turning centers) for removing metal.
- 8458.11.00 Numerically controlled (under: Horizontal lathes): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8458.11.00.05 Used or rebuilt (under: Numerically controlled) (No.).
- 8458.11.00.10 Multiple spindle (under: Other) (No.).
- 8458.11.00.30 With a power rating of less than 18.65 kW (No.).
- 8458.11.00.50 With a power rating of 18.65 kW or greater but not exceeding 37.3 kW (No.).
- 8458.11.00.90 With a power rating exceeding 37.3 kW (No.).
- 8458.19.00 Other (under: Horizontal lathes): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8458.19.00.10 Used or rebuilt (under: Other) (No.).
- 8458.19.00.20 Other, valued under $3,025 each (No.).
- 8458.19.00.30 Engine or toolroom lathes (under: Other) (No.).
- 8458.19.00.50 Single spindle (under: Automatic bar and/or chucking machines) (No.).
- 8458.19.00.70 Multiple spindle (under: Automatic bar and/or chucking machines) (No.).
- 8458.19.00.90 Other (under: Other) (No.).
- 8458.91 Numerically controlled (under: Other lathes).
- 8458.91.10 Vertical turret lathes (under: Numerically controlled): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8458.91.10.40 Used or rebuilt (under: Vertical turret lathes) (No.).
- 8458.91.10.60 Multiple spindle (under: Other) (No.).
- 8458.91.10.80 Other (under: Other) (No.).
- 8458.91.50 Other (under: Numerically controlled): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8458.91.50.40 Used or rebuilt (under: Other) (No.).
- 8458.91.50.50 Multiple spindle (under: Other) (No.).
- 8458.91.50.70 Other (under: Other) (No.).
- 8458.99 Other (under: Other lathes).
- 8458.99.10 Vertical turret lathes (under: Other): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8458.99.10.10 Used or rebuilt (under: Vertical turret lathes) (No.).
- 8458.99.10.50 Other (under: Vertical turret lathes) (No.).
- 8458.99.50 Other (under: Other): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8458.99.50.30 Used or rebuilt (under: Other) (No.).
- 8458.99.50.60 Other, valued under $3,025 each (No.).
- 8458.99.50.90 Other (under: Other) (No.).
From MFG Calcs data: Metal-cutting machine tools
U.S. imports of metal-cutting machine tools (headings 8456, 8457, 8458, 8459, 8460, 8461) came to $4.34B in 2025, with $410M in calculated duty: an effective duty of 9.4%, every duty included.
Effective duty in Sep 2026: 11.7%, against 15.9% in Sep 2025.
Largest sources in 2025: Japan $1.16B at 5.0% effective duty; Germany $954M at 8.3% effective duty; South Korea $472M at 8.0% effective duty; Italy $326M at 9.6% effective duty; Taiwan $259M at 13.1% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.