HTS Heading 8459
Machine tools (including way-type unit head machines) for drilling, boring, milling, threading or tapping by removing metal, other than lathes (including turning centers) of heading 8458
All 41 HTS codes under heading 8459 (machine tools), with their duty rates from the 2026 HTS Revision 23. General duty 3.3% to 4.2%.
Every line of heading 8459
- 8459 Machine tools (including way-type unit head machines) for drilling, boring, milling, threading or tapping by removing metal, other than lathes (including turning centers) of heading 8458.
- 8459.10.00.00 Way-type unit head machines (under: Machine tools (including way-type unit head machines) for drilling, boring, milling, threading or tapping by removing metal, other than lathes (including turning centers) of heading 8458) (No.): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.21.00 Numerically controlled (under: Other drilling machines): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.21.00.40 Used or rebuilt (under: Numerically controlled) (No.).
- 8459.21.00.80 Other (under: Numerically controlled) (No.).
- 8459.29.00 Other (under: Other drilling machines): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.29.00.10 Used or rebuilt (under: Other) (No.).
- 8459.29.00.20 Other, valued under $3,025 each (No.).
- 8459.29.00.40 Multiple spindle (under: Other) (No.).
- 8459.29.00.50 Radial (under: Other) (No.).
- 8459.29.00.70 Upright, excluding sensitive (hand- directed), turret and deep-hole machines (No.).
- 8459.29.00.90 Other (under: Other) (No.).
- 8459.31.00 Numerically controlled (under: Other boring-milling machines): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.31.00.05 Used or rebuilt (under: Numerically controlled) (No.).
- 8459.31.00.10 Table type, excluding planer type (No.).
- 8459.31.00.40 Other (under: Horizontal spindle) (No.).
- 8459.31.00.70 Other (under: Other) (No.).
- 8459.39.00 Other (under: Other boring-milling machines): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.39.00.10 Used or rebuilt (under: Other) (No.).
- 8459.39.00.20 Other, valued under $3,025 each (No.).
- 8459.39.00.40 Horizontal spindle (under: Other) (No.).
- 8459.39.00.50 Other (under: Other) (No.).
- 8459.41.00 Numerically controlled (under: Other boring machines): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.41.00.10 Used or rebuilt (under: Numerically controlled) (No.).
- 8459.41.00.20 Other, valued under $3,025 each (No.).
- 8459.41.00.30 Vertical (under: Other) (No.).
- 8459.41.00.90 Other (under: Other) (No.).
- 8459.49.00 Other (under: Other boring machines): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.49.00.10 Used or rebuilt (under: Other) (No.).
- 8459.49.00.20 Other, valued under $3,025 each (No.).
- 8459.49.00.30 Vertical (under: Other) (No.).
- 8459.49.00.90 Other (under: Other) (No.).
- 8459.51.00 Numerically controlled (under: Milling machines, knee type): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.51.00.40 Used or rebuilt (under: Numerically controlled) (No.).
- 8459.51.00.80 Other (under: Numerically controlled) (No.).
- 8459.59.00 Other (under: Milling machines, knee type): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.59.00.10 Used or rebuilt (under: Other) (No.).
- 8459.59.00.20 Other, valued under $3,025 each (No.).
- 8459.59.00.30 Other (under: Other) (No.).
- 8459.61.00 Numerically controlled (under: Other milling machines): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.61.00.40 Used or rebuilt (under: Numerically controlled) (No.).
- 8459.61.00.80 Other (under: Numerically controlled) (No.).
- 8459.69.00 Other (under: Other milling machines): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.69.00.10 Used or rebuilt (under: Other) (No.).
- 8459.69.00.20 Other, valued under $3,025 each (No.).
- 8459.69.00.50 Profile, duplicating or die sinking (No.).
- 8459.69.00.70 Bed type (under: Other) (No.).
- 8459.69.00.90 Other (under: Other) (No.).
- 8459.70 Other threading or tapping machines.
- 8459.70.40.00 Numerically controlled (under: Other threading or tapping machines) (No.): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.70.80 Other (under: Other threading or tapping machines): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8459.70.80.40 Used or rebuilt (under: Other) (No.).
- 8459.70.80.60 Other, valued under $3,025 each (No.).
- 8459.70.80.80 Other (under: Other) (No.).
From MFG Calcs data: Metal-cutting machine tools
U.S. imports of metal-cutting machine tools (headings 8456, 8457, 8458, 8459, 8460, 8461) came to $4.34B in 2025, with $410M in calculated duty: an effective duty of 9.4%, every duty included.
Effective duty in Sep 2026: 11.7%, against 15.9% in Sep 2025.
Largest sources in 2025: Japan $1.16B at 5.0% effective duty; Germany $954M at 8.3% effective duty; South Korea $472M at 8.0% effective duty; Italy $326M at 9.6% effective duty; Taiwan $259M at 13.1% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.