HTS Heading 8461
Machine tools for planing, shaping, slotting, broaching, gear cutting, gear grinding or gear finishing, sawing, cutting-off and other machine tools working by removing metal or cermets, not elsewhere specified or included
All 33 HTS codes under heading 8461 (machine tools for planing, shaping), with their duty rates from the 2026 HTS Revision 23. General duty 4.4% to 5.8%.
Every line of heading 8461
- 8461 Machine tools for planing, shaping, slotting, broaching, gear cutting, gear grinding or gear finishing, sawing, cutting-off and other machine tools working by removing metal or cermets, not elsewhere specified or included.
- 8461.20 Shaping or slotting machines (under: Machine tools for planing, shaping, slotting, broaching, gear cutting, gear grinding or gear finishing, sawing, cutting-off and other machine tools working by removing metal or cermets, not elsewhere specified or included).
- 8461.20.40.00 Numerically controlled (under: Shaping or slotting machines) (No.): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8461.20.80 Other (under: Shaping or slotting machines): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8461.20.80.30 Used or rebuilt (under: Other) (No.).
- 8461.20.80.70 Other, valued under $3,025 each (No.).
- 8461.20.80.90 Other (under: Other) (No.).
- 8461.30 Broaching machines (under: Machine tools for planing, shaping, slotting, broaching, gear cutting, gear grinding or gear finishing, sawing, cutting-off and other machine tools working by removing metal or cermets, not elsewhere specified or included).
- 8461.30.40 Numerically controlled (under: Broaching machines): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8461.30.40.20 Used or rebuilt (under: Numerically controlled) (No.).
- 8461.30.40.60 Other (under: Numerically controlled) (No.).
- 8461.30.80 Other (under: Broaching machines): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8461.30.80.20 Used or rebuilt (under: Other) (No.).
- 8461.30.80.40 Other, valued under $3,025 each (No.).
- 8461.30.80.80 Other (under: Other) (No.).
- 8461.40 Gear cutting, gear grinding or gear finishing machines.
- 8461.40.10 Gear cutting machines (under: Gear cutting, gear grinding or gear finishing machines): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG)2.9% (JP); Column 2 40%.
- 8461.40.10.10 Used or rebuilt (under: Gear cutting machines) (No.).
- 8461.40.10.20 For bevel gears (under: Other) (No.).
- 8461.40.10.30 Gear hobbers (under: Other) (No.).
- 8461.40.10.40 Gear shapers (under: Other) (No.).
- 8461.40.10.60 Other (under: Other) (No.).
- 8461.40.50 Gear grinding or finishing machines: General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8461.40.50.20 Used or rebuilt (under: Gear grinding or finishing machines) (No.).
- 8461.40.50.40 Other, valued under $3,025 each (No.).
- 8461.40.50.50 For bevel gears (under: Other) (No.).
- 8461.40.50.70 Other (under: Other) (No.).
- 8461.50 Sawing or cutting-off machines.
- 8461.50.40 Numerically controlled (under: Sawing or cutting-off machines): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8461.50.40.10 Used or rebuilt (under: Numerically controlled) (No.).
- 8461.50.40.50 Other (under: Numerically controlled) (No.).
- 8461.50.80 Other (under: Sawing or cutting-off machines): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8461.50.80.10 Used or rebuilt (under: Other) (No.).
- 8461.50.80.20 Other, valued under $3,025 each (No.).
- 8461.50.80.90 Other (under: Other) (No.).
- 8461.90 Other (under: Machine tools for planing, shaping, slotting, broaching, gear cutting, gear grinding or gear finishing, sawing, cutting-off and other machine tools working by removing metal or cermets, not elsewhere specified or included).
- 8461.90.30 Numerically controlled (under: Other): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8461.90.30.20 Used or rebuilt (under: Planing machines) (No.).
- 8461.90.30.40 Other (under: Planing machines) (No.).
- 8461.90.30.60 Used or rebuilt (under: Other) (No.).
- 8461.90.30.80 Other (under: Other) (No.).
- 8461.90.60 Other (under: Other): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8461.90.60.10 Used or rebuilt (under: Planing machines) (No.).
- 8461.90.60.20 Other, valued under $3,025 each (No.).
- 8461.90.60.30 Other (under: Planing machines) (No.).
- 8461.90.60.40 Used or rebuilt (under: Other) (No.).
- 8461.90.60.50 Other, valued under $3,025 each (No.).
- 8461.90.60.90 Other (under: Other) (No.).
From MFG Calcs data: Metal-cutting machine tools
U.S. imports of metal-cutting machine tools (headings 8456, 8457, 8458, 8459, 8460, 8461) came to $4.34B in 2025, with $410M in calculated duty: an effective duty of 9.4%, every duty included.
Effective duty in Sep 2026: 11.7%, against 15.9% in Sep 2025.
Largest sources in 2025: Japan $1.16B at 5.0% effective duty; Germany $954M at 8.3% effective duty; South Korea $472M at 8.0% effective duty; Italy $326M at 9.6% effective duty; Taiwan $259M at 13.1% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.