HTS Heading 8462
Machine tools (including presses) for working metal by forging, hammering or die forging (excluding rolling mills); machine tools (including presses, slitting lines and cut-to-length lines) for working metal by bending, folding, straightening, flattening, shearing, punching, notching or nibbling (excluding drawbenches); presses for working metal or metal carbides, not specified above
All 71 HTS codes under heading 8462 (machine tools (including presses)), with their duty rates from the 2026 HTS Revision 23. General duty 4.4%.
Every line of heading 8462
- 8462 Machine tools (including presses) for working metal by forging, hammering or die forging (excluding rolling mills); machine tools (including presses, slitting lines and cut-to-length lines) for working metal by bending, folding, straightening, flattening, shearing, punching, notching or nibbling (excluding drawbenches); presses for working metal or metal carbides, not specified above.
- 8462.11.00 Closed die forging machines (under: Hot forming machines for forging, die forging (including presses) and hot hammers): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.11.00.10 Used or rebuilt (under: Closed die forging machines) (No.).
- 8462.11.00.30 Headers and upsetters (under: Other) (No.).
- 8462.11.00.35 Mechanical transfer presses (under: Other) (No.).
- 8462.11.00.55 Other (under: Other) (No.).
- 8462.19.00 Other (under: Hot forming machines for forging, die forging (including presses) and hot hammers): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.19.00.10 Used or rebuilt (under: Other) (No.).
- 8462.19.00.30 Headers and upsetters (under: Other) (No.).
- 8462.19.00.35 Mechanical transfer presses (under: Other) (No.).
- 8462.19.00.55 Other (under: Other) (No.).
- 8462.22.00 Profile forming machines (under: Bending, folding, straightening or flattening machines (including press brakes) for flat products): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.22.00.10 Used or rebuilt (under: Profile forming machines) (No.).
- 8462.22.00.20 Other, valued under $3,025 each (No.).
- 8462.22.00.50 Other (under: Profile forming machines) (No.).
- 8462.23.00 Numerically controlled press brakes: General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.23.00.10 Used or rebuilt (under: Numerically controlled press brakes) (No.).
- 8462.23.00.20 Other, valued under $3,025 each (No.).
- 8462.23.00.50 Other (under: Numerically controlled press brakes) (No.).
- 8462.24.00 Numerically controlled panel benders: General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.24.00.10 Used or rebuilt (under: Numerically controlled panel benders) (No.).
- 8462.24.00.20 Other, valued under $3,025 each (No.).
- 8462.24.00.50 Other (under: Numerically controlled panel benders) (No.).
- 8462.25.00 Numerically controlled roll forming machines: General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.25.00.10 Used or rebuilt (under: Numerically controlled roll forming machines) (No.).
- 8462.25.00.20 Other, valued under $3,025 each (No.).
- 8462.25.00.50 Other (under: Numerically controlled roll forming machines) (No.).
- 8462.26.00 Other numerically controlled bending, folding, straightening or flattening machines: General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.26.00.10 Used or rebuilt (under: Other numerically controlled bending, folding, straightening or flattening machines) (No.).
- 8462.26.00.20 Other, valued under $3,025 each (No.).
- 8462.26.00.50 Other (under: Other numerically controlled bending, folding, straightening or flattening machines) (No.).
- 8462.29.00 Other (under: Bending, folding, straightening or flattening machines (including press brakes) for flat products): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.29.00.10 Used or rebuilt (under: Other) (No.).
- 8462.29.00.20 Other, valued under $3,025 each (No.).
- 8462.29.00.30 Press brakes (under: Other) (No.).
- 8462.29.00.40 Bending rolls (under: Other) (No.).
- 8462.29.00.50 Other (under: Other) (No.).
- 8462.32 Slitting lines and cut-to-length lines.
- 8462.32.10 Numerically controlled (under: Slitting lines and cut-to-length lines): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.32.10.40 Used or rebuilt (under: Numerically controlled) (No.).
- 8462.32.10.80 Other (under: Numerically controlled) (No.).
- 8462.32.50 Other (under: Slitting lines and cut-to-length lines): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.32.50.10 Used or rebuilt (under: Other) (No.).
- 8462.32.50.20 Other, valued under $3,025 each (No.).
- 8462.32.50.50 Other (under: Other) (No.).
- 8462.33.00 Numerically controlled shearing machines: General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.33.00.40 Used or rebuilt (under: Numerically controlled shearing machines) (No.).
- 8462.33.00.80 Other (under: Numerically controlled shearing machines) (No.).
- 8462.39.00 Other (under: Slitting lines, cut-to-length lines and other shearing machines (excluding presses) for flat products, other than combined punching and shearing machines): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.39.00.10 Used or rebuilt (under: Other) (No.).
- 8462.39.00.20 Other, valued under $3,025 each (No.).
- 8462.39.00.50 Other (under: Other) (No.).
- 8462.42.00 Numerically controlled (under: Punching, notching or nibbling machines (excluding presses) for flat products including combined punching and shearing machines): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.42.00.40 Used or rebuilt (under: Numerically controlled) (No.).
- 8462.42.00.80 Other (under: Numerically controlled) (No.).
- 8462.49.00 Other (under: Punching, notching or nibbling machines (excluding presses) for flat products including combined punching and shearing machines): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.49.00.10 Used or rebuilt (under: Other) (No.).
- 8462.49.00.20 Other, valued under $3,025 each (No.).
- 8462.49.00.50 Other (under: Other) (No.).
- 8462.51.00 Numerically controlled (under: Machines for working tube, pipe, hollow section and bar (excluding presses)): General 4.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.51.00.40 Used or rebuilt (under: Numerically controlled) (No.).
- 8462.51.00.80 Other (under: Numerically controlled) (No.).
- 8462.59.00 Other (under: Machines for working tube, pipe, hollow section and bar (excluding presses)): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.59.00.10 Used or rebuilt (under: Other) (No.).
- 8462.59.00.20 Other, valued under $3,025 each (No.).
- 8462.59.00.50 Other (under: Other) (No.).
- 8462.61 Hydraulic presses (under: Cold metal working presses).
- 8462.61.40 Numerically controlled (under: Hydraulic presses): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.61.40.30 Used or rebuilt (under: Numerically controlled) (No.).
- 8462.61.40.60 Other (under: Numerically controlled) (No.).
- 8462.61.80 Other (under: Hydraulic presses): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.61.80.30 Used or rebuilt (under: Other) (No.).
- 8462.61.80.90 Other (under: Other) (No.).
- 8462.62 Mechanical presses (under: Cold metal working presses).
- 8462.62.40 Numerically controlled (under: Mechanical presses): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.62.40.10 Used or rebuilt (under: Numerically controlled) (No.).
- 8462.62.40.30 Other (under: Numerically controlled) (No.).
- 8462.62.50 Other (under: Mechanical presses): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.62.50.30 Used or rebuilt (under: Other) (No.).
- 8462.62.50.90 Other (under: Other) (No.).
- 8462.63 Servo-presses (under: Cold metal working presses).
- 8462.63.40 Numerically controlled (under: Servo-presses): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.63.40.10 Used or rebuilt (under: Numerically controlled) (No.).
- 8462.63.40.30 Other (under: Numerically controlled) (No.).
- 8462.63.80 Other (under: Servo-presses): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.63.80.10 Used or rebuilt (under: Other) (No.).
- 8462.63.80.20 Other, valued under $3,025 each (No.).
- 8462.63.80.60 Other (under: Other) (No.).
- 8462.69 Other (under: Cold metal working presses).
- 8462.69.40 Numerically controlled (under: Other): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.69.40.10 Used or rebuilt (under: Numerically controlled) (No.).
- 8462.69.40.30 Other (under: Numerically controlled) (No.).
- 8462.69.80 Other (under: Other): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.69.80.10 Used or rebuilt (under: Other) (No.).
- 8462.69.80.20 Other, valued under $3,025 each (No.).
- 8462.69.80.60 Other (under: Other) (No.).
- 8462.90 Other (under: Machine tools (including presses) for working metal by forging, hammering or die forging (excluding rolling mills); machine tools (including presses, slitting lines and cut-to-length lines) for working metal by bending, folding, straightening, flattening, shearing, punching, notching or nibbling (excluding drawbenches); presses for working metal or metal carbides, not specified above).
- 8462.90.40 Numerically controlled (under: Other): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.90.40.10 Used or rebuilt (under: Numerically controlled) (No.).
- 8462.90.40.30 Other (under: Numerically controlled) (No.).
- 8462.90.80 Other (under: Other): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 8462.90.80.10 Used or rebuilt (under: Other) (No.).
- 8462.90.80.20 Other, valued under $3,025 each (No.).
- 8462.90.80.60 Other (under: Other) (No.).
From MFG Calcs data: Metal-forming machine tools
U.S. imports of metal-forming machine tools (headings 8462, 8463) came to $1.75B in 2025, with $187M in calculated duty: an effective duty of 10.7%, every duty included.
Effective duty in Sep 2026: 10.6%, against 16.1% in Sep 2025.
Largest sources in 2025: Germany $331M at 9.5% effective duty; Italy $311M at 10.8% effective duty; Japan $179M at 5.9% effective duty; South Korea $138M at 5.0% effective duty; Austria $109M at 10.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.