HTS Heading 8465

Machine tools (including machines for nailing, stapling, glueing or otherwise assembling) for working wood, cork, bone, hard rubber, hard plastics or similar hard materials

All 78 HTS codes under heading 8465 (machine tools), with their duty rates from the 2026 HTS Revision 23. General duty 2.4% to 3%.

Every line of heading 8465

  • 8465 Machine tools (including machines for nailing, stapling, glueing or otherwise assembling) for working wood, cork, bone, hard rubber, hard plastics or similar hard materials.
  • 8465.10.00 Machines which can carry out different types of machining operations without tool change between such operations: General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.10.00.05 Tenoners (under: Used or rebuilt) (No.).
  • 8465.10.00.15 Other (under: Used or rebuilt) (No.).
  • 8465.10.00.25 Numerically controlled (under: Tenoners) (No.).
  • 8465.10.00.35 Other (under: Tenoners) (No.).
  • 8465.10.00.45 Other (under: Other) (No.).
  • 8465.10.00.50 Other (under: Machines which can carry out different types of machining operations without tool change between such operations) (No.).
  • 8465.20 Machining centers (under: Machine tools (including machines for nailing, stapling, glueing or otherwise assembling) for working wood, cork, bone, hard rubber, hard plastics or similar hard materials).
  • 8465.20.10.00 For sawing, planing, milling, molding, grinding, sanding, polishing, drilling or mortising (No.): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.20.50.00 For bending or assembling (under: Machining centers) (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.20.80.00 Other (under: Machining centers) (No.): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.91.00 Sawing machines (under: Other): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.91.00.02 Rip saws (under: Used or rebuilt) (No.).
  • 8465.91.00.06 Panel saws (under: Used or rebuilt) (No.).
  • 8465.91.00.12 Band saws (under: Used or rebuilt) (No.).
  • 8465.91.00.16 Cross-cut and optimizing saws (No.).
  • 8465.91.00.22 Other (under: Used or rebuilt) (No.).
  • 8465.91.00.27 Sawmill machines (under: Other) (No.).
  • 8465.91.00.32 Radial arm saws (under: Other) (No.).
  • 8465.91.00.36 Tilting arbor table saws (under: Other) (No.).
  • 8465.91.00.41 Rip saws (under: Other) (No.).
  • 8465.91.00.47 Miter saws (under: Other) (No.).
  • 8465.91.00.49 Scroll saws (under: Other) (No.).
  • 8465.91.00.53 Valued under $3,000 each (under: Panel saws) (No.).
  • 8465.91.00.58 Other (under: Panel saws) (No.).
  • 8465.91.00.64 Valued under $1,000 each (under: Band saws) (No.).
  • 8465.91.00.68 Other (under: Band saws) (No.).
  • 8465.91.00.74 Cross-cut and optimizing saws (No.).
  • 8465.91.00.78 Other (under: Other) (No.).
  • 8465.91.00.91 Other (under: Sawing machines) (No.).
  • 8465.92.00 Planing, milling or molding (by cutting) machines: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.92.00.03 Moulders (under: Used or rebuilt) (No.).
  • 8465.92.00.06 Routers (under: Used or rebuilt) (No.).
  • 8465.92.00.16 Other (under: Used or rebuilt) (No.).
  • 8465.92.00.26 Valued under $3,000 each (under: Dovetailing machines) (No.).
  • 8465.92.00.29 Other (under: Dovetailing machines) (No.).
  • 8465.92.00.31 Moulders (under: Other) (No.).
  • 8465.92.00.34 Valued under $1,000 each (under: Planers) (No.).
  • 8465.92.00.37 Other (under: Planers) (No.).
  • 8465.92.00.42 Valued under $1,000 each (under: Jointers) (No.).
  • 8465.92.00.46 Other (under: Jointers) (No.).
  • 8465.92.00.51 Valued under $3,000 each (under: Routers) (No.).
  • 8465.92.00.55 Numerically controlled (under: Other) (No.).
  • 8465.92.00.58 Other (under: Other) (No.).
  • 8465.92.00.62 Valued under $1,000 each (under: Shapers and profilers) (No.).
  • 8465.92.00.66 Other (under: Shapers and profilers) (No.).
  • 8465.92.00.72 Other (under: Other) (No.).
  • 8465.92.00.91 Other (under: Planing, milling or molding (by cutting) machines) (No.).
  • 8465.93.00 Grinding, sanding or polishing machines: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.93.00.04 Belt sanders, for a belt width 60 cm or wider (No.).
  • 8465.93.00.12 Other (under: Used or rebuilt) (No.).
  • 8465.93.00.30 Valued under $1,000 each (under: Edge belt sanders) (No.).
  • 8465.93.00.45 Valued $1,000 or over but under $3,000 each (No.).
  • 8465.93.00.55 Other (under: Edge belt sanders) (No.).
  • 8465.93.00.65 Belt sanders, for a belt width 60 cm or wider (No.).
  • 8465.93.00.75 Other (under: Other) (No.).
  • 8465.93.00.91 Other (under: Grinding, sanding or polishing machines) (No.).
  • 8465.94.00 Bending or assembling machines: General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.94.00.05 Used or rebuilt (under: For woodworking) (No.).
  • 8465.94.00.15 Doweling machines (under: Other) (No.).
  • 8465.94.00.25 Edgebanding machines (under: Other) (No.).
  • 8465.94.00.35 Laminating machines (under: Other) (No.).
  • 8465.94.00.45 Cold (under: Presses) (No.).
  • 8465.94.00.55 Other (under: Presses) (No.).
  • 8465.94.00.65 Other (under: Other) (No.).
  • 8465.94.00.91 Other (under: Bending or assembling machines) (No.).
  • 8465.95.00 Drilling or mortising machines: General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.95.00.05 Numerically controlled boring machines (No.).
  • 8465.95.00.10 Other (under: Used or rebuilt) (No.).
  • 8465.95.00.20 Numerically controlled (under: Boring machines) (No.).
  • 8465.95.00.35 Valued under $3,000 each (under: Other) (No.).
  • 8465.95.00.45 Other (under: Other) (No.).
  • 8465.95.00.55 Valued under $1,000 each (under: Other drilling machines) (No.).
  • 8465.95.00.60 Other (under: Other drilling machines) (No.).
  • 8465.95.00.65 Other (under: Other) (No.).
  • 8465.95.00.91 Other (under: Drilling or mortising machines) (No.).
  • 8465.96.00 Splitting, slicing or paring machines: General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.96.00.15 Log splitters (under: For woodworking) (No.).
  • 8465.96.00.25 Chippers (under: For woodworking) (No.).
  • 8465.96.00.30 Hogs (under: For woodworking) (No.).
  • 8465.96.00.40 Other (under: For woodworking) (No.).
  • 8465.96.00.51 Other (under: Splitting, slicing or paring machines) (No.).
  • 8465.99.02 Other (under: Other): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8465.99.02.10 Debarkers (under: Woodworking machines) (No.).
  • 8465.99.02.20 Lathes (under: Woodworking machines) (No.).
  • 8465.99.02.30 Other (under: Woodworking machines) (No.).
  • 8465.99.02.50 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.