HTS Heading 8464
Machine tools for working stone, ceramics, concrete, asbestos-cement or like mineral materials or for cold working glass
All 5 HTS codes under heading 8464 (machine tools for working stone), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2%.
Every line of heading 8464
- 8464 Machine tools for working stone, ceramics, concrete, asbestos-cement or like mineral materials or for cold working glass.
- 8464.10.01.00 Sawing machines (under: Machine tools for working stone, ceramics, concrete, asbestos-cement or like mineral materials or for cold working glass) (No.): General Free; Special none; Column 2 35%.
- 8464.20.01 Grinding or polishing machines: General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8464.20.01.10 Glass-working machines (under: Grinding or polishing machines) (No.).
- 8464.20.01.20 Other (under: Grinding or polishing machines) (No.).
- 8464.90.01 Other (under: Machine tools for working stone, ceramics, concrete, asbestos-cement or like mineral materials or for cold working glass): General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8464.90.01.10 Glass-working machines (under: Other) (No.).
- 8464.90.01.20 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.