HTS Heading 8468
Machinery and apparatus for soldering, brazing or welding, whether or not capable of cutting, other than those of heading 8515; gas-operated surface tempering machines and appliances; parts thereof
All 7 HTS codes under heading 8468 (machinery and apparatus for soldering), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.9%.
Every line of heading 8468
- 8468 Machinery and apparatus for soldering, brazing or welding, whether or not capable of cutting, other than those of heading 8515; gas-operated surface tempering machines and appliances; parts thereof.
- 8468.10.00.00 Hand-held blow torches (under: Machinery and apparatus for soldering, brazing or welding, whether or not capable of cutting, other than those of heading 8515; gas-operated surface tempering machines and appliances; parts thereof) (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8468.20 Other gas-operated machinery and apparatus.
- 8468.20.10.00 Hand-directed or -controlled (under: Other gas-operated machinery and apparatus) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8468.20.50.00 Other (under: Other gas-operated machinery and apparatus) (No.): General Free; Special none; Column 2 27.5%.
- 8468.80 Other machinery and apparatus.
- 8468.80.10.00 Hand-directed or -controlled (under: Other machinery and apparatus) (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8468.80.50.00 Other (under: Other machinery and apparatus) (No.): General Free; Special none; Column 2 27.5%.
- 8468.90 Parts (under: Machinery and apparatus for soldering, brazing or welding, whether or not capable of cutting, other than those of heading 8515; gas-operated surface tempering machines and appliances; parts thereof).
- 8468.90.10.00 Of hand-directed or -controlled machinery and apparatus (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8468.90.50.00 Other (under: Parts) (No.): General Free; Special none; Column 2 27.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.