HTS Heading 8467

Tools for working in the hand, pneumatic, hydraulic or with self-contained electric or nonelectric motor, and parts thereof

All 39 HTS codes under heading 8467 (tools for working in the hand, pneumatic), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.5%.

Every line of heading 8467

  • 8467 Tools for working in the hand, pneumatic, hydraulic or with self-contained electric or nonelectric motor, and parts thereof.
  • 8467.11 Rotary type (including combined rotary-percussion).
  • 8467.11.10 Suitable for metal working (under: Rotary type (including combined rotary-percussion)): General 4.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8467.11.10.40 Grinders, polishers and sanders (No.).
  • 8467.11.10.80 Other (under: Suitable for metal working) (No.).
  • 8467.11.50 Other (under: Rotary type (including combined rotary-percussion)): General Free; Special none; Column 2 27.5%.
  • 8467.11.50.10 Rock drills (under: Other) (No.).
  • 8467.11.50.20 Drills, other than rock drills; screwdrivers and nut runners (No.).
  • 8467.11.50.40 Wrenches, other than nut runners (No.).
  • 8467.11.50.90 Other (under: Other) (No.).
  • 8467.19 Other (under: Pneumatic).
  • 8467.19.10.00 Suitable for metal working (under: Other) (No.): General 4.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8467.19.50 Other (under: Other): General Free; Special none; Column 2 27.5%.
  • 8467.19.50.30 Pneumatic, hand-held force feed lubricating equipment (No.).
  • 8467.19.50.60 Designed for use in construction or mining (No.).
  • 8467.19.50.90 Other (under: Other) (No.).
  • 8467.21.00 Drills of all kinds (under: With self-contained electric motor): General 1.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8467.21.00.10 Battery powered (under: Rotary) (No.).
  • 8467.21.00.30 With a chuck capacity of less than 12.7 mm (No.).
  • 8467.21.00.50 Other (under: Other) (No.).
  • 8467.21.00.70 Other, including hammer drills (No.).
  • 8467.22.00 Saws (under: With self-contained electric motor): General Free; Special none; Column 2 35%.
  • 8467.22.00.20 Circular (under: Saws) (No.).
  • 8467.22.00.40 Chain (under: Saws) (No.).
  • 8467.22.00.70 Reciprocating and jig (under: Saws) (No.).
  • 8467.22.00.90 Other (under: Saws) (No.).
  • 8467.29.00 Other (under: With self-contained electric motor): General Free; Special none; Column 2 35%.
  • 8467.29.00.10 Angle grinders, sanders and polishers (No.).
  • 8467.29.00.15 Orbital and straight-line sanders (No.).
  • 8467.29.00.25 Belt sanders (under: Other) (No.).
  • 8467.29.00.35 Other (under: Other) (No.).
  • 8467.29.00.40 Screwdrivers, nut-runners and impact wrenches (No.).
  • 8467.29.00.55 Routers (under: Other) (No.).
  • 8467.29.00.65 Planers (under: Other) (No.).
  • 8467.29.00.70 Grass and weed trimmers/edgers (No.).
  • 8467.29.00.80 Electropneumatic rotary and percussion hammers (No.).
  • 8467.29.00.85 Electric scissors (under: Other) (No.).
  • 8467.29.00.90 Other (under: Other) (No.).
  • 8467.81.00.00 Chain saws (under: Other tools) (No.): General Free; Special none; Column 2 27.5%.
  • 8467.89 Other (under: Other tools).
  • 8467.89.10.00 Suitable for metal working (under: Other) (No.): General Free; Special none; Column 2 30%.
  • 8467.89.50 Other (under: Other): General Free; Special none; Column 2 27.5%.
  • 8467.89.50.30 Gasoline powered grass and weed trimmers and brushcutters (No.).
  • 8467.89.50.60 Other, designed for use in agriculture or horticulture (No.).
  • 8467.89.50.90 Other (under: Other) (No.).
  • 8467.91.01.00 Of chain saws (under: Parts) (No.): General Free; Special none; Column 2 27.5%.
  • 8467.92.00 Of pneumatic tools (under: Parts): General Free; Special none; Column 2 27.5%.
  • 8467.92.00.50 Of pneumatic, hand-held force feed lubricating equipment (No.).
  • 8467.92.00.90 Other (under: Of pneumatic tools) (No.).
  • 8467.99.01 Other (under: Parts): General Free; Special none; Column 2 27.5%.
  • 8467.99.01.30 Of gasoline powered grass and weed trimmers and brushcutters (No.).
  • 8467.99.01.90 Other (under: Other) (No.).

From MFG Calcs data: Powered hand tools

U.S. imports of powered hand tools (heading 8467) came to $6.62B in 2025, with $910M in calculated duty: an effective duty of 13.8%, every duty included.

Effective duty in Sep 2026: 11.8%, against 22.0% in Sep 2025.

Largest sources in 2025: China $1.93B at 21.7% effective duty; Vietnam $1.62B at 9.4% effective duty; Mexico $1.43B at 11.6% effective duty; Germany $467M at 10.7% effective duty; Taiwan $330M at 9.7% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.