HTS Heading 8473

Parts and accessories (other than covers, carrying cases and the like) suitable for use solely or principally with machines of headings 8470 to 8472

All 14 HTS codes under heading 8473 (parts and accessories), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2%.

Every line of heading 8473

  • 8473 Parts and accessories (other than covers, carrying cases and the like) suitable for use solely or principally with machines of headings 8470 to 8472.
  • 8473.21.00.00 Of the electronic calculating machines of subheading 8470.10, 8470.21 or 8470.29 (kg): General Free; Special none; Column 2 35%.
  • 8473.29.00.00 Other (under: Parts and accessories of the machines of heading 8470) (kg): General Free; Special none; Column 2 35%.
  • 8473.30 Parts and accessories of the machines of heading 8471.
  • 8473.30.11 Printed circuit assemblies (under: Not incorporating a cathode ray tube): General Free; Special none; Column 2 35%.
  • 8473.30.11.40 Memory modules suitable for use solely or principally with machines of heading 8471 (No.).
  • 8473.30.11.80 Other (under: Printed circuit assemblies) (No.).
  • 8473.30.20.00 Parts and accessories, including face plates and lock latches, of printed circuit assemblies (No.): General Free; Special none; Column 2 35%.
  • 8473.30.51.00 Other (under: Not incorporating a cathode ray tube) (No.): General Free; Special none; Column 2 35%.
  • 8473.30.91.00 Other (under: Parts and accessories of the machines of heading 8471) (No.): General Free; Special none; Column 2 35%.
  • 8473.40 Parts and accessories of the machines of heading 8472.
  • 8473.40.10.00 Printed circuit assemblies for automatic teller machines of subheading 8472.90.10 (No.): General Free; Special none; Column 2 35%.
  • 8473.40.21.00 Printed circuit assemblies of word processing machines of 8472.90.50 (No.): General Free; Special none; Column 2 45%.
  • 8473.40.41.00 Other parts and accessories of the machines of 8472.90.50 (kg): General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8473.40.86.00 Other (under: Parts and accessories of the machines of heading 8472) (kg): General Free; Special none; Column 2 35%.
  • 8473.50 Parts and accessories equally suitable for use with machines of two or more of the headings 8470 to 8472.
  • 8473.50.30.00 Printed circuit assemblies (under: Parts and accessories equally suitable for use with machines of two or more of the headings 8470 to 8472) (No.): General Free; Special none; Column 2 35%.
  • 8473.50.60.00 Parts and accessories, including face plates and lock latches, of printed circuit assemblies (kg): General Free; Special none; Column 2 35%.
  • 8473.50.90.00 Other (under: Parts and accessories equally suitable for use with machines of two or more of the headings 8470 to 8472) (kg): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.