HTS Heading 8474
Machinery for sorting, screening, separating, washing, crushing, grinding, mixing or kneading earth, stone, ores or other mineral substances, in solid (including powder or paste) form; machinery for agglomerating, shaping or molding solid mineral fuels, ceramic paste, unhardened cements, plastering materials or other mineral products in powder or paste form; machines for forming foundry molds of sand; parts thereof
All 16 HTS codes under heading 8474 (machinery for sorting, screening), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8474
- 8474 Machinery for sorting, screening, separating, washing, crushing, grinding, mixing or kneading earth, stone, ores or other mineral substances, in solid (including powder or paste) form; machinery for agglomerating, shaping or molding solid mineral fuels, ceramic paste, unhardened cements, plastering materials or other mineral products in powder or paste form; machines for forming foundry molds of sand; parts thereof.
- 8474.10.00 Sorting, screening, separating or washing machines: General Free; Special none; Column 2 35%.
- 8474.10.00.10 Portable (under: Sorting, screening, separating or washing machines) (No.).
- 8474.10.00.90 Stationary (under: Sorting, screening, separating or washing machines) (No.).
- 8474.20.00 Crushing or grinding machines: General Free; Special none; Column 2 35%.
- 8474.20.00.10 Portable (under: Crushing or grinding machines) (No.).
- 8474.20.00.50 Crushing (under: Stationary) (No.).
- 8474.20.00.70 Other (under: Stationary) (No.).
- 8474.31.00.00 Concrete or mortar mixers (under: Mixing or kneading machines) (No.): General Free; Special none; Column 2 35%.
- 8474.32.00.00 Machines for mixing mineral substances with bitumen (No.): General Free; Special none; Column 2 35%.
- 8474.39.00.00 Other (under: Mixing or kneading machines) (No.): General Free; Special none; Column 2 35%.
- 8474.80.00 Other machinery (under: Machinery for sorting, screening, separating, washing, crushing, grinding, mixing or kneading earth, stone, ores or other mineral substances, in solid (including powder or paste) form; machinery for agglomerating, shaping or molding solid mineral fuels, ceramic paste, unhardened cements, plastering materials or other mineral products in powder or paste form; machines for forming foundry molds of sand; parts thereof): General Free; Special none; Column 2 35%.
- 8474.80.00.10 Designed for use with ceramic paste, unhardened cements and plastering materials (No.).
- 8474.80.00.15 Other (under: For agglomerating, shaping or molding solid mineral fuels, ceramic paste, unhardened cements, plastering materials or other mineral products in powder or paste form) (No.).
- 8474.80.00.20 Machines for forming foundry molds of sand (No.).
- 8474.80.00.80 Other (under: Other machinery) (No.).
- 8474.90.00 Parts (under: Machinery for sorting, screening, separating, washing, crushing, grinding, mixing or kneading earth, stone, ores or other mineral substances, in solid (including powder or paste) form; machinery for agglomerating, shaping or molding solid mineral fuels, ceramic paste, unhardened cements, plastering materials or other mineral products in powder or paste form; machines for forming foundry molds of sand; parts thereof): General Free; Special none; Column 2 35%.
- 8474.90.00.10 Of sorting, screening, separating or washing machines (No.).
- 8474.90.00.20 Of crushing or grinding machines (No.).
- 8474.90.00.50 Of mixing or kneading machines (No.).
- 8474.90.00.90 Other (under: Parts) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.