HTS Heading 8476
Automatic goods-vending machines (for example, postage stamp, cigarette, food or beverage machines), including money-changing machines; parts thereof
All 5 HTS codes under heading 8476 (automatic goods-vending machines), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8476
- 8476 Automatic goods-vending machines (for example, postage stamp, cigarette, food or beverage machines), including money-changing machines; parts thereof.
- 8476.21.00.00 Incorporating heating or refrigerating devices (No.): General Free; Special none; Column 2 35%.
- 8476.29.00.00 Other (under: Automatic beverage-vending machines) (No.): General Free; Special none; Column 2 35%.
- 8476.81.00.00 Incorporating heating or refrigerating devices (No.): General Free; Special none; Column 2 35%.
- 8476.89.00.00 Other (under: Other machines) (No.): General Free; Special none; Column 2 35%.
- 8476.90.00.00 Parts (under: Automatic goods-vending machines (for example, postage stamp, cigarette, food or beverage machines), including money-changing machines; parts thereof) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.