HTS Heading 8475

Machines for assembling electric or electronic lamps, tubes or flashbulbs, in glass envelopes; machines for manufacturing or hot working glass or glassware; parts thereof

All 5 HTS codes under heading 8475 (machines for assembling electric), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8475

  • 8475 Machines for assembling electric or electronic lamps, tubes or flashbulbs, in glass envelopes; machines for manufacturing or hot working glass or glassware; parts thereof.
  • 8475.10.00.00 Machines for assembling electric or electronic lamps, tubes or flashbulbs, in glass envelopes (No.): General Free; Special none; Column 2 35%.
  • 8475.21.00.00 Machines for making optical fibers and preforms thereof (No.): General Free; Special none; Column 2 35%.
  • 8475.29.00.00 Other (under: Machines for manufacturing or hot working glass or glassware) (No.): General Free; Special none; Column 2 35%.
  • 8475.90 Parts (under: Machines for assembling electric or electronic lamps, tubes or flashbulbs, in glass envelopes; machines for manufacturing or hot working glass or glassware; parts thereof).
  • 8475.90.10.00 Of machines for assembling electric or electronic lamps, tubes or flashbulbs, in glass envelopes (No.): General Free; Special none; Column 2 35%.
  • 8475.90.90.00 Other (under: Parts) (No.): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.