HTS Heading 8480
Molding boxes for metal foundry; mold bases; molding patterns; molds for metal (other than ingot molds), metal carbides, glass, mineral materials, rubber or plastics
All 19 HTS codes under heading 8480 (molding boxes for metal foundry), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.8%.
Every line of heading 8480
- 8480 Molding boxes for metal foundry; mold bases; molding patterns; molds for metal (other than ingot molds), metal carbides, glass, mineral materials, rubber or plastics.
- 8480.10.00.00 Molding boxes for metal foundry (No.): General 3.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8480.20.00.00 Mold bases (under: Molding boxes for metal foundry; mold bases; molding patterns; molds for metal (other than ingot molds), metal carbides, glass, mineral materials, rubber or plastics) (No.): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 8480.30.00.00 Molding patterns (under: Molding boxes for metal foundry; mold bases; molding patterns; molds for metal (other than ingot molds), metal carbides, glass, mineral materials, rubber or plastics) (No.): General 2.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 8480.41.00.00 Injection or compression types (No.): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8480.49.00 Other types (under: Molds for metal or metal carbides): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8480.49.00.10 Molds for centrifugal casting of ductile iron pipe (No.).
- 8480.49.00.90 Other (under: Other types) (No.).
- 8480.50.00 Molds for glass (under: Molding boxes for metal foundry; mold bases; molding patterns; molds for metal (other than ingot molds), metal carbides, glass, mineral materials, rubber or plastics): General Free; Special none; Column 2 35%.
- 8480.50.00.10 Injection or compression types (No.).
- 8480.50.00.90 Other types (under: Molds for glass) (No.).
- 8480.60.00 Molds for mineral materials (under: Molding boxes for metal foundry; mold bases; molding patterns; molds for metal (other than ingot molds), metal carbides, glass, mineral materials, rubber or plastics): General Free; Special none; Column 2 35%.
- 8480.60.00.10 Injection or compression types (No.).
- 8480.60.00.90 Other types (under: Molds for mineral materials) (No.).
- 8480.71 Injection or compression types.
- 8480.71.10.00 For shoe machinery (under: Injection or compression types) (No.): General Free; Special none; Column 2 Free.
- 8480.71.40.00 For the manufacture of semiconductor devices (No.): General Free; Special none; Column 2 Free.
- 8480.71.80 Other (under: Injection or compression types): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8480.71.80.20 Temporarily imported for testing, calibration, examination, repair or alteration; returned after being exported for testing, calibration, examination, repair or alteration (No.).
- 8480.71.80.45 Injection type (under: Other) (No.).
- 8480.71.80.60 Compression type (under: Other) (No.).
- 8480.79 Other types (under: Molds for rubber or plastics).
- 8480.79.10.00 Molds for shoe machinery (under: Other types) (No.): General Free; Special none; Column 2 Free.
- 8480.79.90 Other (under: Other types): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8480.79.90.10 Blow molds (under: Other) (No.).
- 8480.79.90.20 Bladder operated molds (under: Other) (No.).
- 8480.79.90.90 Other molds (under: Other) (No.).
From MFG Calcs data: Molds and die sets
U.S. imports of molds and die sets (heading 8480) came to $2.28B in 2025, with $321M in calculated duty: an effective duty of 14.1%, every duty included.
Effective duty in Sep 2026: 14.5%, against 21.2% in Sep 2025.
Largest sources in 2025: Canada $848M at 0.9% effective duty; China $348M at 54.2% effective duty; Germany $190M at 11.8% effective duty; Japan $133M at 10.0% effective duty; South Korea $129M at 9.7% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.