Tariff monitor · Machinery & Equipment
Molds and Die Sets: Statutory & Effective Tariff Rates
USITC Column 1 General rates for 12 molds and die sets HTS lines (parseable range 0%–3.8%). Effective rate Aug 2026: 13.59%; monthly history since 2014.
The short answer
- The observed effective calculated-duty rate on U.S. imports of molds and die sets was 13.59% in Aug 2026, down from 18.47% a year earlier — USITC Calculated Duties divided by covered customs value. The Column 1 General line-rate range is 0%–3.8% across 12 HTS lines in the 2026 schedule; individual lines are called “Free” only when the official General field is literally Free, which still does not determine a shipment’s final duty. Canada is the largest source, holding 37.2% of 2025 imports.
Statutory rates from the schedule
- Injection molds, die-casting dies, compression molds, and die sets — the tooling behind every molded and stamped part. This family covers HTS heading 8480: 12 eight-digit rate lines with a parseable Column 1 General range of 0%–3.8% in the 2026 schedule. “Free” means the official General field is literally Free for that line; it does not determine final entry liability.
Observed calculated-duty data
- Latest month on record (2026-08): 13.59% effective on $223.2M of imports, versus 18.47% in the same month a year earlier. The monthly archive holds 152 observations from 2014-01 through 2026-08.
- In 2025, U.S. imports for consumption in this family totaled $2.3B in customs value, with $321.0M in USITC reported calculated duty on $2.3B of covered customs value: an effective calculated-duty rate of 14.1%. The aggregate reflects the recorded entry mix but does not attribute the result to a specific legal provision.
- A year earlier the effective calculated-duty rate was 4.97%, so the observed rate rose 9.1 points.
- Top source countries in 2025: Canada ($847.9M at 0.91%), China ($348.1M at 54.17%), Germany ($189.6M at 11.84%), Japan ($133.0M at 10.04%), South Korea ($128.9M at 9.72%).
- Reported freight and insurance equaled 3% of covered customs value in 2025 ($68.2M total), from USITC DataWeb. It is shown alongside the effective calculated-duty rate and is not part of the customs-value duty base.
- Customs unit value: 69.7364 per unit in 2025, aggregate declared customs value divided by reported quantity across eligible single-unit lines (USITC DataWeb); not a transaction price.
Representative rate lines
- 8480.10.00.00: Molding boxes for metal foundry · MFN 3.8%
- 8480.20.00.00: Mold bases · MFN 3.4%
- 8480.30.00.00: Molding patterns · MFN 2.8%
- 8480.41.00.00: Injection or compression types · MFN 3.1%
- 8480.49.00: Other types · MFN 3.1%
- 8480.50.00: Molds for glass · MFN Free
- 8480.60.00: Molds for mineral materials · MFN Free
- 8480.71.10.00: For shoe machinery · MFN Free
Frequently asked questions
- What is the U.S. tariff rate on molds and die sets? USITC calculated duties imply an effective rate of 13.59% in Aug 2026 (calculated duties ÷ covered customs value, USITC DataWeb). The parseable Column 1 General line-rate range is 0%–3.8%; individual lines are called “Free” only when the official General field is literally Free, and product, origin, preference and tariff mix can contribute to the observed-rate difference.
- What are the statutory MFN line rates for molds and die sets? The parseable Column 1 General line-rate range is 0%–3.8% across the family's 12 eight-digit HTS lines in the 2026 Harmonized Tariff Schedule (headings 8480). “Free” means the official General field is literally Free for a line; it does not determine final entry liability.
- Which countries supply the most molds and die sets to the U.S.? Top retained sources in 2025: Canada ($847.9M at 0.91%), China ($348.1M at 54.17%), Germany ($189.6M at 11.84%). Canada holds 37.2% of total family import customs value. Retained sources cover 85.8%; their HHI is 1790, a lower bound whose floor falls in the moderately concentrated range without classifying the omitted tail.
- How much molds and die sets does the U.S. import? $2.3B of customs value in 2025, with $321.0M in USITC Calculated Duties — an effective calculated-duty rate of 14.1%.
- Is the U.S. a net importer of molds and die sets? Yes — a net importer in 2025: $2.3B imported vs $600.5M exported (exports are 26% of imports).
- What is the customs unit value of molds and die sets? $69.7/unit in 2025, derived as customs value ÷ reported quantity from USITC DataWeb. It is an aggregate across the family's product and origin mix, not a transaction price or supplier quote.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-08.