HTS Heading 8485
Machines for additive manufacturing
All 6 HTS codes under heading 8485 (machines for additive manufacturing), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.1%.
Every line of heading 8485
- 8485 Machines for additive manufacturing.
- 8485.10.01.00 By metal deposit (under: Machines for additive manufacturing) (No.): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8485.20.00.00 By plastics or rubber deposit (No.): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8485.30.00.00 By plaster, cement, ceramics or glass deposit (No.): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8485.80.00.00 Other (under: Machines for additive manufacturing) (No.): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8485.90 Parts (under: Machines for additive manufacturing).
- 8485.90.10.00 By plastics or rubber deposit (No.): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8485.90.90.00 Other (under: Parts) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.