HTS Heading 8486
Machines and apparatus of a kind used solely or principally for the manufacture of semiconductor boules or wafers, semiconductor devices, electronic integrated circuits or flat panel displays; machines and apparatus specified in note 11(C) to this chapter; parts and accessories
All 7 HTS codes under heading 8486 (machines and apparatus), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8486
- 8486 Machines and apparatus of a kind used solely or principally for the manufacture of semiconductor boules or wafers, semiconductor devices, electronic integrated circuits or flat panel displays; machines and apparatus specified in note 11(C) to this chapter; parts and accessories.
- 8486.10.00.00 Machines and apparatus for the manufacture of boules or wafers (No.): General Free; Special none; Column 2 35%.
- 8486.20.00.00 Machines and apparatus for the manufacture of semiconductor devices or of electronic integrated circuits (No.): General Free; Special none; Column 2 35%.
- 8486.30.00.00 Machines and apparatus for the manufacture of flat panel displays (No.): General Free; Special none; Column 2 35%.
- 8486.40.00 Machines and apparatus specified in note 11(C) to this chapter: General Free; Special none; Column 2 35%.
- 8486.40.00.10 For the manufacture or repair of masks and reticles (No.).
- 8486.40.00.20 For assembling semiconductor devices or electronic integrated circuits (No.).
- 8486.40.00.30 For lifting, handling, loading or unloading of boules, wafers, semiconductor devices, electronic integrated circuits and flat panel displays (No.).
- 8486.90.00.00 Parts and accessories (under: Machines and apparatus of a kind used solely or principally for the manufacture of semiconductor boules or wafers, semiconductor devices, electronic integrated circuits or flat panel displays; machines and apparatus specified in note 11(C) to this chapter; parts and accessories) (No.): General Free; Special none; Column 2 35%.
From MFG Calcs data: Semiconductor and display equipment
U.S. imports of semiconductor and display equipment (heading 8486) came to $12.21B in 2025, with $508M in calculated duty: an effective duty of 4.2%, every duty included.
Effective duty in Sep 2026: 0.6%, against 4.3% in Sep 2025.
Largest sources in 2025: Japan $2.98B at 2.5% effective duty; Netherlands $2.67B at 1.4% effective duty; Singapore $1.39B at 1.0% effective duty; Malaysia $956M at 1.9% effective duty; Germany $947M at 2.6% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.