HTS Heading 8487
Machinery parts, not containing electrical connectors, insulators, coils, contacts or other electrical features, and not specified or included elsewhere in this chapter
All 4 HTS codes under heading 8487 (machinery parts), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.9%.
Every line of heading 8487
- 8487 Machinery parts, not containing electrical connectors, insulators, coils, contacts or other electrical features, and not specified or included elsewhere in this chapter.
- 8487.10.00 Ships' or boats' propellers and blades therefor: General Free; Special none; Column 2 30%.
- 8487.10.00.40 Of copper (under: Ships' or boats' propellers and blades therefor) (No.).
- 8487.10.00.80 Other (under: Ships' or boats' propellers and blades therefor) (No.).
- 8487.90.00 Other (under: Machinery parts, not containing electrical connectors, insulators, coils, contacts or other electrical features, and not specified or included elsewhere in this chapter): General 3.9%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8487.90.00.40 Oil seals, other than those of chapter 40 (kg).
- 8487.90.00.80 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.