HTS Heading 8508
Vacuum cleaners; parts thereof
All 4 HTS codes under heading 8508 (vacuum cleaners), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8508
- 8508 Vacuum cleaners; parts thereof.
- 8508.11.00.00 Of a power not exceeding 1,500 W and having a dust bag or other receptacle capacity not exceeding 20 l (No.): General Free; Special none; Column 2 35%.
- 8508.19.00.00 Other (under: With self-contained electric motor) (No.): General Free; Special none; Column 2 35%.
- 8508.60.00.00 Other vacuum cleaners (under: Vacuum cleaners; parts thereof) (No.): General Free; Special none; Column 2 35%.
- 8508.70.00.00 Parts (under: Vacuum cleaners; parts thereof) (kg): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.