HTS Heading 8507
Electric storage batteries, including separators therefor, whether or not rectangular (including square); parts thereof
All 19 HTS codes under heading 8507 (electric storage batteries), with their duty rates from the 2026 HTS Revision 23. General duty 2.5% to 3.5%.
Every line of heading 8507
- 8507 Electric storage batteries, including separators therefor, whether or not rectangular (including square); parts thereof.
- 8507.10.00 Lead-acid storage batteries, of a kind used for starting piston engines: General 3.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.10.00.30 Not exceeding 6 kg in weight (under: 12 V batteries) (No., kg).
- 8507.10.00.60 Exceeding 6 kg in weight (under: 12 V batteries) (No., kg).
- 8507.10.00.90 Other (under: Lead-acid storage batteries, of a kind used for starting piston engines) (No., kg).
- 8507.20 Other lead-acid storage batteries.
- 8507.20.40.00 Of a kind used as the primary source of electrical power for electrically powered vehicles of subheadings 8703.40, 8703.50, 8703.60, 8703.70 or 8703.80 (No., kg): General 3.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.20.80 Other (under: Other lead-acid storage batteries): General 3.5%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.20.80.31 6 V batteries (under: Other) (No., kg).
- 8507.20.80.41 12 V batteries (under: Other) (No., kg).
- 8507.20.80.61 36 V batteries (under: Other) (No., kg).
- 8507.20.80.92 Other (under: Other) (No., kg).
- 8507.30 Nickel-cadmium storage batteries.
- 8507.30.40.00 Of a kind used as the primary source of electrical power for electrically powered vehicles of subheadings 8703.40, 8703.50, 8703.60, 8703.70 or 8703.80 (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.30.80 Other (under: Nickel-cadmium storage batteries): General 2.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.30.80.10 Sealed (under: Other) (No.).
- 8507.30.80.90 Other (under: Other) (No.).
- 8507.50.00.00 Nickel-metal hydride batteries (No., kg): General 3.4%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.60.00 Lithium-ion batteries (under: Electric storage batteries, including separators therefor, whether or not rectangular (including square); parts thereof): General 3.4%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.60.00.10 Of a kind used as the primary source of electrical power for electrically powered vehicles of subheadings 8703.40, 8703.50, 8703.60, 8703.70 or 8703.80 (No., kg).
- 8507.60.00.30 Battery energy storage systems fully encased within a housing, as described in statistical note 2 to this chapter (No., kg).
- 8507.60.00.90 Other (under: Other) (No., kg).
- 8507.80 Other storage batteries (under: Electric storage batteries, including separators therefor, whether or not rectangular (including square); parts thereof).
- 8507.80.41.00 Of a kind used as the primary source of electrical power for electrically powered vehicles of subheadings 8703.40, 8703.50, 8703.60, 8703.70 or 8703.80 (No.): General 3.4%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.80.82.00 Other (under: Other storage batteries) (No., kg): General 3.4%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.90 Parts (under: Electric storage batteries, including separators therefor, whether or not rectangular (including square); parts thereof).
- 8507.90.40.00 Of lead-acid storage batteries (kg): General 3.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8507.90.80.00 Other (under: Parts) (kg): General 3.4%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
From MFG Calcs data: Batteries and storage cells
U.S. imports of batteries and storage cells (headings 8506, 8507) came to $27.08B in 2025, with $4.34B in calculated duty: an effective duty of 16.0%, every duty included.
Effective duty in Sep 2026: 14.0%, against 22.2% in Sep 2025.
Largest sources in 2025: China $12.23B at 24.0% effective duty; South Korea $3.88B at 7.9% effective duty; Japan $3.63B at 12.2% effective duty; Mexico $1.71B at 1.5% effective duty; Vietnam $973M at 13.5% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.