HTS Heading 8516

Electric instantaneous or storage water heaters and immersion heaters; electric space heating apparatus and soil heating apparatus; electrothermic hairdressing apparatus (for example, hair dryers, hair curlers, curling tong heaters) and hand dryers; electric flatirons; other electrothermic appliances of a kind used for domestic purposes; electric heating resistors, other than those of heading 8545; parts thereof

All 43 HTS codes under heading 8516 (electric instantaneous), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.3%.

Every line of heading 8516

  • 8516 Electric instantaneous or storage water heaters and immersion heaters; electric space heating apparatus and soil heating apparatus; electrothermic hairdressing apparatus (for example, hair dryers, hair curlers, curling tong heaters) and hand dryers; electric flatirons; other electrothermic appliances of a kind used for domestic purposes; electric heating resistors, other than those of heading 8545; parts thereof.
  • 8516.10.00 Electric instantaneous or storage water heaters and immersion heaters: General Free; Special none; Column 2 35%.
  • 8516.10.00.40 Storage water heaters (under: Electric instantaneous or storage water heaters and immersion heaters) (No.).
  • 8516.10.00.80 Other water heaters and immersion heaters (No.).
  • 8516.21.00.00 Storage heating radiators (under: Electric space heating apparatus and electric soil heating apparatus) (No.): General Free; Special none; Column 2 35%.
  • 8516.29.00 Other (under: Electric space heating apparatus and electric soil heating apparatus): General 3.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8516.29.00.30 Fan-forced (under: Portable space heaters) (No.).
  • 8516.29.00.60 Other (under: Portable space heaters) (No.).
  • 8516.29.00.90 Other (under: Other) (No.).
  • 8516.31.00.00 Hair dryers (under: Electrothermic hairdressing or hand-drying apparatus) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8516.32.00 Other hairdressing apparatus (under: Electrothermic hairdressing or hand-drying apparatus): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8516.32.00.20 Curlers (under: Other hairdressing apparatus) (No.).
  • 8516.32.00.40 Other (under: Other hairdressing apparatus) (No.).
  • 8516.33.00.00 Hand-drying apparatus (under: Electrothermic hairdressing or hand-drying apparatus) (No.): General Free; Special none; Column 2 35%.
  • 8516.40 Electric flatirons (under: Electric instantaneous or storage water heaters and immersion heaters; electric space heating apparatus and soil heating apparatus; electrothermic hairdressing apparatus (for example, hair dryers, hair curlers, curling tong heaters) and hand dryers; electric flatirons; other electrothermic appliances of a kind used for domestic purposes; electric heating resistors, other than those of heading 8545; parts thereof).
  • 8516.40.20.00 Travel type (under: Electric flatirons) (No.): General Free; Special none; Column 2 35%.
  • 8516.40.40.00 Other (under: Electric flatirons) (No.): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8516.50.00 Microwave ovens (under: Electric instantaneous or storage water heaters and immersion heaters; electric space heating apparatus and soil heating apparatus; electrothermic hairdressing apparatus (for example, hair dryers, hair curlers, curling tong heaters) and hand dryers; electric flatirons; other electrothermic appliances of a kind used for domestic purposes; electric heating resistors, other than those of heading 8545; parts thereof): General 2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8516.50.00.30 Having a capacity not exceeding 22.5 liters (No.).
  • 8516.50.00.60 Having a capacity exceeding 22.5 liters but not exceeding 31.0 liters (No.).
  • 8516.50.00.90 Having a capacity exceeding 31.0 liters (No.).
  • 8516.60 Other ovens; cooking stoves, ranges, cooking plates, boiling rings, grillers and roasters.
  • 8516.60.40 Cooking stoves, ranges and ovens: General Free; Special none; Column 2 35%.
  • 8516.60.40.60 Microwave oven combinations (under: Cooking stoves, ranges and ovens) (No.).
  • 8516.60.40.70 Portable (under: Other) (No.).
  • 8516.60.40.74 Of a maximum width not exceeding 70 centimeters (No.).
  • 8516.60.40.78 Containing a gas fueled cooktop (No.).
  • 8516.60.40.82 Containing a radiant heated cooktop (No.).
  • 8516.60.40.86 Other (under: Of a maximum width exceeding 70 centimeters) (No.).
  • 8516.60.60.00 Other (under: Other ovens; cooking stoves, ranges, cooking plates, boiling rings, grillers and roasters) (No.): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8516.71.00 Coffee or tea makers (under: Other electrothermic appliances): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8516.71.00.20 Automatic drip and pump type (under: Coffee makers) (No.).
  • 8516.71.00.40 Percolator (under: Coffee makers) (No.).
  • 8516.71.00.60 Other (under: Coffee makers) (No.).
  • 8516.71.00.80 Other (under: Coffee or tea makers) (No.).
  • 8516.72.00.00 Toasters (under: Other electrothermic appliances) (No.): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8516.79.00.00 Other (under: Other electrothermic appliances) (No.): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8516.80 Electric heating resistors (under: Electric instantaneous or storage water heaters and immersion heaters; electric space heating apparatus and soil heating apparatus; electrothermic hairdressing apparatus (for example, hair dryers, hair curlers, curling tong heaters) and hand dryers; electric flatirons; other electrothermic appliances of a kind used for domestic purposes; electric heating resistors, other than those of heading 8545; parts thereof).
  • 8516.80.40.00 Assembled only with simple insulated former and electrical connections, used for anti-icing or deicing (No.): General Free; Special none; Column 2 35%.
  • 8516.80.80.00 Other (under: Electric heating resistors) (No.): General Free; Special none; Column 2 35%.
  • 8516.90 Parts (under: Electric instantaneous or storage water heaters and immersion heaters; electric space heating apparatus and soil heating apparatus; electrothermic hairdressing apparatus (for example, hair dryers, hair curlers, curling tong heaters) and hand dryers; electric flatirons; other electrothermic appliances of a kind used for domestic purposes; electric heating resistors, other than those of heading 8545; parts thereof).
  • 8516.90.05.00 Of heaters or heating apparatus of subheading 8516.10, 8516.21 or 8516.29 (No.): General 3.7%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8516.90.15.00 Housings for the hand-drying apparatus of subheading 8516.33 (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8516.90.25.00 Housings and steel bases for the electric flatirons of subheading 8516.40 (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8516.90.35.00 Assemblies, incorporating more than one of the following: cooking chamber; structural supporting chassis; door; outer case (No.): General Free; Special none; Column 2 35%.
  • 8516.90.45.00 Printed circuit assemblies (under: Parts for the microwave ovens of subheading 8516.50) (No.): General Free; Special none; Column 2 35%.
  • 8516.90.50.00 Other (under: Parts for the microwave ovens of subheading 8516.50) (No.): General Free; Special none; Column 2 35%.
  • 8516.90.55.00 Cooking chambers, whether or not assembled (No.): General Free; Special none; Column 2 35%.
  • 8516.90.65.00 Top surface panels with or without heating elements or controls (No.): General Free; Special none; Column 2 35%.
  • 8516.90.75.00 Door assemblies, incorporating more than one of the following: inner panel; outer panel; window; insulation (No.): General Free; Special none; Column 2 35%.
  • 8516.90.80 Other (under: Parts for the cooking stoves, ranges and ovens of subheading 8516.60.40): General Free; Special none; Column 2 35%.
  • 8516.90.80.10 Shelving and racks for cooking stoves and ranges (No.).
  • 8516.90.80.50 Other (under: Other) (No.).
  • 8516.90.85.00 Housings for toasters (under: Parts) (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8516.90.90.00 Other (under: Parts) (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.