HTS Heading 8517

Telephone sets, including smartphones and other telephones for cellular networks or for other wireless networks; other apparatus for the transmission or reception of voice, images or other data, including apparatus for communication in a wired or wireless network (such as a local or wide area network), other than transmission or reception apparatus of heading 8443, 8525, 8527 or 8528; parts thereof

All 15 HTS codes under heading 8517 (telephone sets), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8517

  • 8517 Telephone sets, including smartphones and other telephones for cellular networks or for other wireless networks; other apparatus for the transmission or reception of voice, images or other data, including apparatus for communication in a wired or wireless network (such as a local or wide area network), other than transmission or reception apparatus of heading 8443, 8525, 8527 or 8528; parts thereof.
  • 8517.11.00.00 Line telephone sets with cordless handsets (No.): General Free; Special none; Column 2 35%.
  • 8517.13.00.00 Smartphones (under: Telephone sets, including smartphones and other telephones for cellular networks or for other wireless networks) (No.): General Free; Special none; Column 2 35%.
  • 8517.14.00 Other telephones for cellular networks or for other wireless networks: General Free; Special none; Column 2 35%.
  • 8517.14.00.20 Radio telephones designed for installation in motor vehicles for the Public Cellular Radiotelecommunication Service (No.).
  • 8517.14.00.50 Other radio telephones designed for the Public Cellular Radiotelecommunication Service (No.).
  • 8517.14.00.80 Other (under: Other telephones for cellular networks or for other wireless networks) (No.).
  • 8517.18.00 Other (under: Telephone sets, including smartphones and other telephones for cellular networks or for other wireless networks): General Free; Special none; Column 2 35%.
  • 8517.18.00.10 Videophones (under: Other) (No.).
  • 8517.18.00.20 Multiline telephones (including key, call director and consoles) (No.).
  • 8517.18.00.50 Other (under: Other) (No.).
  • 8517.61.00.00 Base stations (under: Other apparatus for transmission or reception of voice, images or other data, including apparatus for communication in a wired or wireless network (such as a local or wide area network)) (No.): General Free; Special none; Column 2 35%.
  • 8517.62.00 Machines for the reception, conversion and transmission or regeneration of voice, images or other data, including switching and routing apparatus: General Free; Special none; Column 2 35%.
  • 8517.62.00.10 Modems, of a kind used with data processing machines of heading 8471 (No.).
  • 8517.62.00.20 Switching and routing apparatus (No.).
  • 8517.62.00.90 Other (under: Machines for the reception, conversion and transmission or regeneration of voice, images or other data, including switching and routing apparatus) (No.).
  • 8517.69.00.00 Other (under: Other apparatus for transmission or reception of voice, images or other data, including apparatus for communication in a wired or wireless network (such as a local or wide area network)) (No.): General Free; Special none; Column 2 35%.
  • 8517.71.00.00 Aerials and aerial reflectors of all kinds; parts suitable for use therewith (No.): General Free; Special none; Column 2 35%.
  • 8517.79.00.00 Other (under: Parts) (No.): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.