HTS Heading 8522

Parts and accessories suitable for use solely or principally with the apparatus of heading 8519 or 8521

All 9 HTS codes under heading 8522 (parts and accessories suitable), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.9%.

Every line of heading 8522

  • 8522 Parts and accessories suitable for use solely or principally with the apparatus of heading 8519 or 8521.
  • 8522.10.00.00 Pickup cartridges (under: Parts and accessories suitable for use solely or principally with the apparatus of heading 8519 or 8521) (No.): General 3.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8522.90 Other (under: Parts and accessories suitable for use solely or principally with the apparatus of heading 8519 or 8521).
  • 8522.90.25.00 Printed circuit assemblies (under: Assemblies and subassemblies of articles provided for in subheading 8519.81.41, consisting of two or more pieces fastened or joined together) (No.): General Free; Special none; Column 2 35%.
  • 8522.90.36.00 Other (under: Assemblies and subassemblies of articles provided for in subheading 8519.81.41, consisting of two or more pieces fastened or joined together) (No.): General Free; Special none; Column 2 35%.
  • 8522.90.45.00 Printed circuit assemblies (under: Parts of telephone answering machines) (No.): General Free; Special none; Column 2 35%.
  • 8522.90.58 Other (under: Parts of telephone answering machines): General Free; Special none; Column 2 35%.
  • 8522.90.58.40 Magnetic recording and reproducing heads (No.).
  • 8522.90.58.80 Other (under: Other) (No.).
  • 8522.90.65.00 Printed circuit assemblies (under: Other) (No.): General Free; Special none; Column 2 35%.
  • 8522.90.80 Other (under: Other): General Free; Special none; Column 2 35%.
  • 8522.90.80.40 Magnetic recording and reproducing heads (No.).
  • 8522.90.80.81 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.