HTS Heading 8521
Video recording or reproducing apparatus, whether or not incorporating a video tuner
All 4 HTS codes under heading 8521 (video recording or reproducing apparatus), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8521
- 8521 Video recording or reproducing apparatus, whether or not incorporating a video tuner.
- 8521.10 Magnetic tape-type (under: Video recording or reproducing apparatus, whether or not incorporating a video tuner).
- 8521.10.30.00 Not capable of recording (under: Color, cartridge or cassette type) (No.): General Free; Special none; Column 2 35%.
- 8521.10.60.00 Other (under: Color, cartridge or cassette type) (No.): General Free; Special none; Column 2 35%.
- 8521.10.90.00 Other (under: Magnetic tape-type) (No.): General Free; Special none; Column 2 35%.
- 8521.90.00.00 Other (under: Video recording or reproducing apparatus, whether or not incorporating a video tuner) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.