HTS Heading 8524

Flat panel display modules, whether or not incorporating touch-sensitive screens

All 8 HTS codes under heading 8524 (flat panel display modules), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.5%.

Every line of heading 8524

  • 8524 Flat panel display modules, whether or not incorporating touch-sensitive screens.
  • 8524.11 Of liquid crystals (under: Without drivers or controls circuits).
  • 8524.11.10.00 Flat panel display modules, other than flat panel display modules for articles of subheadings 8528.59, 8528.69, 8528.72 and 8528.73 (No.): General Free; Special none; Column 2 45%.
  • 8524.11.90.00 Other (under: Of liquid crystals) (No.): General 4.5%; Special Free (A,AU, BH,CL, CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 45%.
  • 8524.12.00.00 Of organic light-emitting diodes (OLED) (No.): General Free; Special none; Column 2 45%.
  • 8524.19.00.00 Other (under: Without drivers or controls circuits) (No.): General Free; Special none; Column 2 45%.
  • 8524.91 Of liquid crystals (under: Other).
  • 8524.91.10.00 Flat panel display modules, other than flat panel display modules for articles of subheadings 8528.59, 8528.69, 8528.72 and 8528.73 (No.): General Free; Special none; Column 2 45%.
  • 8524.91.90.00 Other (under: Of liquid crystals) (No.): General 4.5%; Special Free (A,AU, BH,CL, CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 45%.
  • 8524.92.00.00 Of organic light-emitting diodes (OLED) (No.): General Free; Special none; Column 2 45%.
  • 8524.99.00.00 Other (under: Other) (No.): General Free; Special none; Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.