HTS Heading 8525

Transmission apparatus for radio-broadcasting or television, whether or not incorporating reception apparatus or sound recording or reproducing apparatus; television cameras, digital cameras and video camera recorders

All 21 HTS codes under heading 8525 (transmission apparatus), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8525

  • 8525 Transmission apparatus for radio-broadcasting or television, whether or not incorporating reception apparatus or sound recording or reproducing apparatus; television cameras, digital cameras and video camera recorders.
  • 8525.50 Transmission apparatus (under: Transmission apparatus for radio-broadcasting or television, whether or not incorporating reception apparatus or sound recording or reproducing apparatus; television cameras, digital cameras and video camera recorders).
  • 8525.50.10.00 Set top boxes which have a communication function (No.): General Free; Special none; Column 2 35%.
  • 8525.50.30 Other (under: Television): General Free; Special none; Column 2 35%.
  • 8525.50.30.15 Apparatus for the reception of television signals relayed by television satellite (No.).
  • 8525.50.30.35 Converters, decoders, preamplifiers, line amplifiers, distribution amplifiers and other amplifiers; directional couplers and other couplers; all the foregoing designed for cable or closed-circuit television applications (No.).
  • 8525.50.30.40 Other (under: Other) (No.).
  • 8525.50.70 For radiobroadcasting (under: Transmission apparatus): General Free; Special none; Column 2 35%.
  • 8525.50.70.10 Transmitters (under: For radiobroadcasting) (No.).
  • 8525.50.70.50 Other (under: For radiobroadcasting) (No.).
  • 8525.60 Transmission apparatus incorporating reception apparatus.
  • 8525.60.10 Transceivers (under: Transmission apparatus incorporating reception apparatus): General Free; Special none; Column 2 35%.
  • 8525.60.10.10 Citizens Band (CB) (under: Transceivers) (No.).
  • 8525.60.10.20 Low-power radiotelephonic transceivers operating on frequencies from 49.82 to 49.90 MHz (No.).
  • 8525.60.10.30 Hand-held (under: Other) (No.).
  • 8525.60.10.40 Marine VHF-FM (under: Other) (No.).
  • 8525.60.10.50 Other (under: Other) (No.).
  • 8525.60.20.00 Other (under: Transmission apparatus incorporating reception apparatus) (No.): General Free; Special none; Column 2 35%.
  • 8525.81.00.00 High-speed goods as specified in subheading note 1 to this chapter (No.): General Free; Special none; Column 2 35%.
  • 8525.82.00.00 Other, radiation-hardened or radiation-tolerant goods as specified in subheading note 2 to this chapter (No.): General Free; Special none; Column 2 35%.
  • 8525.83.00.00 Other, night vision goods as specified in subheading note 3 to this chapter (No.): General Free; Special none; Column 2 35%.
  • 8525.89 Other (under: Television cameras, digital cameras and video camera recorders).
  • 8525.89.10.00 Gyrostabilized television cameras (No.): General Free; Special none; Column 2 35%.
  • 8525.89.20.00 Studio television cameras excluding shoulder-carried and other portable cameras (No.): General Free; Special none; Column 2 35%.
  • 8525.89.30.00 Other (under: Television cameras) (No.): General Free; Special none; Column 2 35%.
  • 8525.89.40.00 Digital still image video cameras (No.): General Free; Special none; Column 2 35%.
  • 8525.89.50 Other (under: Other): General Free; Special none; Column 2 35%.
  • 8525.89.50.30 Camcorders (under: Other) (No.).
  • 8525.89.50.50 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.