HTS Heading 8529
Parts suitable for use solely or principally with the apparatus of headings 8524 to 8528
All 46 HTS codes under heading 8529 (parts suitable for use solely or principally), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8529
- 8529 Parts suitable for use solely or principally with the apparatus of headings 8524 to 8528.
- 8529.10 Antennas and antenna reflectors of all kinds; parts suitable for use therewith.
- 8529.10.21 Television (under: Antennas and antenna reflectors of all kinds; parts suitable for use therewith): General Free; Special none; Column 2 35%.
- 8529.10.21.20 Receiving only (under: Antennas) (No.).
- 8529.10.21.50 Other (under: Antennas) (No.).
- 8529.10.21.90 Other (under: Television) (No.).
- 8529.10.40 Radar, radio navigational aid and radio remote control: General Free; Special none; Column 2 35%.
- 8529.10.40.40 Antennas (under: Radar, radio navigational aid and radio remote control) (No.).
- 8529.10.40.80 Other (under: Radar, radio navigational aid and radio remote control) (No.).
- 8529.10.91.00 Other (under: Antennas and antenna reflectors of all kinds; parts suitable for use therewith) (No.): General Free; Special none; Column 2 35%.
- 8529.90 Other (under: Parts suitable for use solely or principally with the apparatus of headings 8524 to 8528).
- 8529.90.04.00 Tuners (under: Of television apparatus) (No.): General Free; Special none; Column 2 35%.
- 8529.90.05.00 Entered with components enumerated in additional U.S. note 4 to this chapter (No.): General Free; Special none; Column 2 35%.
- 8529.90.06.00 Other (under: Other, comprising printed circuit boards and ceramic substrates with components assembled thereon, for color television receivers; subassemblies containing one or more of such boards or substrates, except tuners or convergence assemblies) (No.): General Free; Special none; Column 2 35%.
- 8529.90.09.00 For television cameras (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8529.90.13.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8529.90.16 Assemblies and subassemblies, consisting of 2 or more parts or pieces fastened or joined together: General Free; Special none; Column 2 35%.
- 8529.90.16.20 Of radar apparatus (under: Assemblies and subassemblies, consisting of 2 or more parts or pieces fastened or joined together) (No.).
- 8529.90.16.40 Of radio navigational aid apparatus (except radar) (No.).
- 8529.90.16.60 Other (under: Assemblies and subassemblies, consisting of 2 or more parts or pieces fastened or joined together) (No.).
- 8529.90.19 Other (under: Of radar, radio navigational aid or radio remote control apparatus): General Free; Special none; Column 2 35%.
- 8529.90.19.20 Of radar apparatus (under: Other) (No.).
- 8529.90.19.40 Of radio navigational aid apparatus (except radar) (No.).
- 8529.90.19.60 Other (under: Other) (No.).
- 8529.90.21.00 Other (under: Printed circuit assemblies) (No.): General Free; Special none; Column 2 35%.
- 8529.90.24.01 Transceiver assemblies for the apparatus of subheading 8526.10, other than printed circuit assemblies (No.): General Free; Special none; Column 2 35%.
- 8529.90.29.00 Tuners (under: Parts of television receivers specified in additional U.S. note 9 to this chapter, other than printed circuit assemblies) (No.): General Free; Special none; Column 2 35%.
- 8529.90.33.00 Entered with components enumerated in additional U.S. note 4 to this chapter (No.): General Free; Special none; Column 2 35%.
- 8529.90.36.00 Other (under: Subassemblies, for color television receivers, containing two or more printed circuit boards or ceramic substrates with components assembled thereon, except tuners or convergence assemblies) (No.): General Free; Special none; Column 2 35%.
- 8529.90.39.00 Other (under: Parts of television receivers specified in additional U.S. note 9 to this chapter, other than printed circuit assemblies) (No.): General Free; Special none; Column 2 35%.
- 8529.90.43.00 Entered with components enumerated in additional U.S. note 4 to this chapter (No.): General Free; Special none; Column 2 35%.
- 8529.90.46.00 Other (under: Subassemblies, for color television receivers, containing two or more printed circuit boards or ceramic substrates with components assembled thereon, except tuners or convergence assemblies) (No.): General Free; Special none; Column 2 35%.
- 8529.90.49.00 Other (under: Combinations of parts specified in additional U.S. note 9 to this chapter) (No.): General Free; Special none; Column 2 35%.
- 8529.90.55.00 Flat panel screen assemblies for the apparatus of subheadings 8528.59.15, 8528.59.23, 8528.59.25, 8528.59.33, 8528.69.35, 8525.69.40, 8528.69.45, 8528.69.50, 8528.72.62, 8528.72.64, 8528.72.68 and 8528.72.72 (No.): General Free; Special none; Column 2 35%.
- 8529.90.63.00 For television cameras (under: Of television apparatus) (No.): General Free; Special none; Column 2 35%.
- 8529.90.68.00 Other (under: Of television apparatus) (No.): General Free; Special none; Column 2 35%.
- 8529.90.73.00 Of radar, radio navigational aid or radio remote control apparatus (No.): General Free; Special none; Column 2 35%.
- 8529.90.77.00 Other (under: Other, parts of printed circuit assemblies, including face plates and lock latches) (No.): General Free; Special none; Column 2 35%.
- 8529.90.78.00 Mounted lenses suitable for use in, and entered separately from, closed-circuit television cameras, with or without attached electrical or non-electrical closed-circuit television camera connectors, and with or without attached motors (No.): General Free; Special none; Column 2 35%.
- 8529.90.81.00 Other (under: For television cameras) (No.): General Free; Special none; Column 2 35%.
- 8529.90.83.00 Other (under: Of television apparatus) (No.): General Free; Special none; Column 2 35%.
- 8529.90.87.00 Other (under: Other parts of articles of headings 8525 and 8527) (No.): General Free; Special none; Column 2 35%.
- 8529.90.88.00 Entered with components enumerated in additional U.S. note 4 to this chapter (No.): General Free; Special none; Column 2 35%.
- 8529.90.89.00 Other (under: Subassemblies, for color television receivers, containing two or more printed circuit boards or ceramic substrates with components assembled thereon, except tuners or convergence assemblies) (No.): General Free; Special none; Column 2 35%.
- 8529.90.93 Other (under: Of television receivers): General Free; Special none; Column 2 35%.
- 8529.90.93.45 Convergence assemblies, focus coils and degaussing coils (No.).
- 8529.90.93.80 Other (under: Other) (No.).
- 8529.90.95 Assemblies and subassemblies, consisting of 2 or more parts or pieces fastened or joined together: General Free; Special none; Column 2 35%.
- 8529.90.95.20 Of radar apparatus (under: Assemblies and subassemblies, consisting of 2 or more parts or pieces fastened or joined together) (No.).
- 8529.90.95.40 Of radio navigational aid apparatus (except radar) (No.).
- 8529.90.95.60 Other (under: Assemblies and subassemblies, consisting of 2 or more parts or pieces fastened or joined together) (No.).
- 8529.90.97 Other (under: Of radar, radio navigational aid or radio remote control apparatus): General Free; Special none; Column 2 35%.
- 8529.90.97.20 Of radar apparatus (under: Other) (No.).
- 8529.90.97.40 Of radio navigational aid apparatus (except radar) (No.).
- 8529.90.97.60 Other (under: Other) (No.).
- 8529.90.98.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.