HTS Heading 8528

Monitors and projectors, not incorporating television reception apparatus; reception apparatus for television, whether or not incorporating radio-broadcast receivers or sound or video recording or reproducing apparatus

All 79 HTS codes under heading 8528 (monitors and projectors), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5%.

Every line of heading 8528

  • 8528 Monitors and projectors, not incorporating television reception apparatus; reception apparatus for television, whether or not incorporating radio-broadcast receivers or sound or video recording or reproducing apparatus.
  • 8528.42.00.00 Capable of directly connecting to and designed for use with an automatic data processing machine of heading 8471 (No.): General Free; Special none; Column 2 35%.
  • 8528.49 Other (under: Cathode-ray tube monitors).
  • 8528.49.05.00 Incorporating video recording or reproducing apparatus (No.): General Free; Special none; Column 2 25%.
  • 8528.49.10.00 Other (under: Incomplete or unfinished (including assemblies consisting of the parts specified in subdivisions (a), (b), (c) and (e) in additional U.S. note 9 to this chapter plus a power supply), presented without a display device) (No.): General Free; Special none; Column 2 35%.
  • 8528.49.15.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 25%.
  • 8528.49.20.00 Other (under: Incorporating video recording or reproducing apparatus) (No.): General Free; Special none; Column 2 25%.
  • 8528.49.25.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 35%.
  • 8528.49.30.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
  • 8528.49.35.00 Incorporating video recording or reproducing apparatus (No.): General Free; Special none; Column 2 25%.
  • 8528.49.40.00 Other (under: Non-high definition, having a single picture tube intended for direct viewing (non-projection type), with a video display diagonal exceeding 35.56 cm) (No.): General Free; Special none; Column 2 35%.
  • 8528.49.45.00 Incorporating video recording or reproducing apparatus (No.): General Free; Special none; Column 2 25%.
  • 8528.49.50.00 Other (under: Non-high definition, projection type, with a cathode-ray tube) (No.): General Free; Special none; Column 2 35%.
  • 8528.49.60.00 Incorporating video recording or reproducing apparatus (No.): General Free; Special none; Column 2 25%.
  • 8528.49.65.00 Other (under: High definition, non-projection type, with a cathode-ray tube) (No.): General Free; Special none; Column 2 35%.
  • 8528.49.70.00 Incorporating video recording or reproducing apparatus (No.): General Free; Special none; Column 2 25%.
  • 8528.49.75.00 Other (under: High definition, projection type, with a cathode-ray tube) (No.): General Free; Special none; Column 2 35%.
  • 8528.49.80.00 Black and white or other monochrome (No.): General Free; Special none; Column 2 35%.
  • 8528.52.00.00 Capable of directly connecting to and designed for use with an automatic data processing machine of heading 8471 (No.): General Free; Special none; Column 2 35%.
  • 8528.59 Other (under: Other monitors).
  • 8528.59.05.00 Incorporating video recording or reproducing apparatus (No.): General Free; Special none; Column 2 25%.
  • 8528.59.10.00 Other (under: Incomplete or unfinished (including assemblies consisting of the parts specified in subdivisions (a), (b), (c) and (e) in additional U.S. note 9 to this chapter plus a power supply), presented without a display device) (No.): General Free; Special none; Column 2 35%.
  • 8528.59.15.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 25%.
  • 8528.59.23.00 Other (under: Incorporating video recording or reproducing apparatus) (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.59.25.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 35%.
  • 8528.59.33 Other (under: Other): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.59.33.10 Plasma-type (under: Other) (No.).
  • 8528.59.33.50 LCD-type (direct view) (under: Other) (No.).
  • 8528.59.33.70 Other (under: Other) (No.).
  • 8528.59.35.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 25%.
  • 8528.59.40.00 Other (under: Incorporating video recording or reproducing apparatus) (No.): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.59.45.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 35%.
  • 8528.59.50.00 Other (under: Other) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.59.60.00 Black and white or other monochrome (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.62.00.00 Capable of directly connecting to and designed for use with an automatic data processing machine of heading 8471 (No.): General Free; Special none; Column 2 35%.
  • 8528.69 Other (under: Projectors).
  • 8528.69.05.00 Incorporating video recording or reproducing apparatus (No.): General Free; Special none; Column 2 25%.
  • 8528.69.10.00 Other (under: Incomplete or unfinished (including assemblies consisting of the parts specified in subdivisions (a), (b), (c) and (e) in additional U.S. note 9 to this chapter plus a power supply), presented without a display device) (No.): General Free; Special none; Column 2 35%.
  • 8528.69.15.00 Incorporating video recording or reproducing apparatus (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.69.20.00 Other (under: Non-high definition, with a cathode-ray tube) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.69.25.00 Incorporating video recording or reproducing apparatus (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.69.30.00 Other (under: High definition, with a cathode-ray tube) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.69.35.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 25%.
  • 8528.69.40.00 Other (under: Incorporating video recording or reproducing apparatus) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.69.45.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 35%.
  • 8528.69.50.00 Other (under: Other) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.69.55.00 Incorporating video recording or reproducing apparatus (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.69.60.00 Other (under: Other) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.69.70.00 Black and white or other monochrome (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.71 Not designed to incorporate a video display or screen.
  • 8528.71.10.00 Incorporating video recording or reproducing apparatus (No.): General Free; Special none; Column 2 25%.
  • 8528.71.20.00 Set top boxes which have a communications function (No.): General Free; Special none; Column 2 35%.
  • 8528.71.30.00 Printed circuit assemblies incorporating a tuner, of a kind used with data processing machines of heading 8471 (No.): General Free; Special none; Column 2 35%.
  • 8528.71.40.00 Color (under: Other) (No.): General Free; Special none; Column 2 35%.
  • 8528.71.45.00 Black and white or other monochrome (No.): General Free; Special none; Column 2 35%.
  • 8528.72 Other, color (under: Reception apparatus for television, whether or not incorporating radio-broadcast receivers or sound or video recording or reproducing apparatus).
  • 8528.72.04.00 Incorporating video recording or reproducing apparatus (No.): General Free; Special none; Column 2 25%.
  • 8528.72.08.00 Other (under: Incomplete or unfinished (including assemblies for television receivers consisting of all the parts specified in additional U.S. note 9 to this chapter plus a power supply), presented without a display device) (No.): General Free; Special none; Column 2 35%.
  • 8528.72.12.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 25%.
  • 8528.72.16.00 Other (under: Incorporating video recording or reproducing apparatus) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.72.20.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 35%.
  • 8528.72.24.00 Other (under: Other) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.72.28.00 Incorporating video recording or reproducing apparatus (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.72.32.00 Other (under: Non-high definition, having a single picture tube intended for direct viewing (non-projection type), with a video display diagonal exceeding 35.56 cm) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.72.36.00 Incorporating video recording or reproducing apparatus (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.72.40.00 Other (under: Non-high definition, projection type, with a cathode-ray tube) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.72.44.00 Incorporating video recording or reproducing apparatus (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.72.48.00 Other (under: High definition, non-projection type, with a cathode-ray tube) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.72.52.00 Incorporating video recording or reproducing apparatus (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.72.56.00 Other (under: High definition, projection type, with a cathode-ray tube) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.72.62.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 25%.
  • 8528.72.64 Other (under: Incorporating video recording or reproducing apparatus): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.72.64.20 Not exceeding 75 cm (under: With a video display diagonal) (No.).
  • 8528.72.64.30 Exceeding 75 cm but not exceeding 88 cm (No.).
  • 8528.72.64.40 Exceeding 88 cm but not exceeding 113 cm (No.).
  • 8528.72.64.60 Exceeding 113 cm (under: With a video display diagonal) (No.).
  • 8528.72.68.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 35%.
  • 8528.72.72 Other (under: Other): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.72.72.20 Not exceeding 75 cm (under: LCD-type (direct-view), with a video display diagonal) (No.).
  • 8528.72.72.30 Exceeding 75 cm but not exceeding 88 cm (No.).
  • 8528.72.72.40 Exceeding 88 cm but not exceeding 113 cm (No.).
  • 8528.72.72.60 Exceeding 113 cm (under: LCD-type (direct-view), with a video display diagonal) (No.).
  • 8528.72.72.90 Other, including plasma-type (under: Other) (No.).
  • 8528.72.76.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 25%.
  • 8528.72.80.00 Other (under: Incorporating video recording or reproducing apparatus) (No.): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8528.72.84.00 With a video display diagonal not exceeding 34.29 cm (No.): General Free; Special none; Column 2 35%.
  • 8528.72.97.00 Other (under: Other) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8528.73.00.00 Other, monochrome (under: Reception apparatus for television, whether or not incorporating radio-broadcast receivers or sound or video recording or reproducing apparatus) (No.): General 5%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.