HTS Heading 8536
Electrical apparatus for switching or protecting electrical circuits, or for making connections to or in electrical circuits (for example, switches, relays, fuses, surge suppressors, plugs, sockets, lamp-holders and other connectors, junction boxes), for a voltage not exceeding 1,000 V; connectors for optical fibers, optical fiber bundles or cables
All 43 HTS codes under heading 8536 (electrical apparatus for switching), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.7%.
Every line of heading 8536
- 8536 Electrical apparatus for switching or protecting electrical circuits, or for making connections to or in electrical circuits (for example, switches, relays, fuses, surge suppressors, plugs, sockets, lamp-holders and other connectors, junction boxes), for a voltage not exceeding 1,000 V; connectors for optical fibers, optical fiber bundles or cables.
- 8536.10.00 Fuses (under: Electrical apparatus for switching or protecting electrical circuits, or for making connections to or in electrical circuits (for example, switches, relays, fuses, surge suppressors, plugs, sockets, lamp-holders and other connectors, junction boxes), for a voltage not exceeding 1,000 V; connectors for optical fibers, optical fiber bundles or cables): General 2.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8536.10.00.20 Glass cartridge (under: Fuses) (No.).
- 8536.10.00.40 Other (under: Fuses) (No.).
- 8536.20.00 Automatic circuit breakers (under: Electrical apparatus for switching or protecting electrical circuits, or for making connections to or in electrical circuits (for example, switches, relays, fuses, surge suppressors, plugs, sockets, lamp-holders and other connectors, junction boxes), for a voltage not exceeding 1,000 V; connectors for optical fibers, optical fiber bundles or cables): General 2.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8536.20.00.20 Molded case (under: Automatic circuit breakers) (No.).
- 8536.20.00.40 Other (under: Automatic circuit breakers) (No.).
- 8536.30 Other apparatus for protecting electrical circuits.
- 8536.30.40.00 Motor overload protectors (under: Other apparatus for protecting electrical circuits) (No.): General Free; Special none; Column 2 35%.
- 8536.30.80.00 Other (under: Other apparatus for protecting electrical circuits) (No.): General Free; Special none; Column 2 35%.
- 8536.41.00 For a voltage not exceeding 60 V: General 2.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8536.41.00.05 Automotive signaling flashers (No.).
- 8536.41.00.20 Electromechanical (under: With contacts rated at less than 10 A) (No.).
- 8536.41.00.30 Other (under: With contacts rated at less than 10 A) (No.).
- 8536.41.00.45 Contactors (under: Other) (No.).
- 8536.41.00.50 Electromechanical (under: Other) (No.).
- 8536.41.00.60 Other (under: Other) (No.).
- 8536.49.00 Other (under: Relays): General 2.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8536.49.00.50 Electromechanical (under: With contacts rated at less than 10 A) (No.).
- 8536.49.00.55 Other (under: With contacts rated at less than 10 A) (No.).
- 8536.49.00.65 Contactors (under: Other) (No.).
- 8536.49.00.75 Electromechanical (under: Other) (No.).
- 8536.49.00.80 Other (under: Other) (No.).
- 8536.50 Other switches (under: Electrical apparatus for switching or protecting electrical circuits, or for making connections to or in electrical circuits (for example, switches, relays, fuses, surge suppressors, plugs, sockets, lamp-holders and other connectors, junction boxes), for a voltage not exceeding 1,000 V; connectors for optical fibers, optical fiber bundles or cables).
- 8536.50.40.00 Motor starters (under: Other switches) (No.): General Free; Special none; Column 2 35%.
- 8536.50.70.00 Electronic AC switches consisting of optically coupled input and output circuits (insulated thyristor AC switches); electronic switches, including temperature protected switches, consisting of a transistor and a logic chip (chip-on-chip technology); electromechanical snap-action switches for a current not exceeding 11 amps (No.): General Free; Special none; Column 2 35%.
- 8536.50.90 Other (under: Other): General Free; Special none; Column 2 35%.
- 8536.50.90.20 Rated at not over 5 A (under: Rotary) (No.).
- 8536.50.90.25 Rated at over 5 A (under: Rotary) (No.).
- 8536.50.90.31 Momentary contact (under: Rated at not over 5 A) (No.).
- 8536.50.90.32 Other, gang switches (under: Rated at not over 5 A) (No.).
- 8536.50.90.33 Other (under: Rated at not over 5 A) (No.).
- 8536.50.90.35 Rated at over 5 A (under: Push-button) (No.).
- 8536.50.90.40 Snap-action, other than limit (No.).
- 8536.50.90.45 Knife (under: Other) (No.).
- 8536.50.90.50 Slide (under: Other) (No.).
- 8536.50.90.55 Limit (under: Other) (No.).
- 8536.50.90.65 Other (under: Other) (No.).
- 8536.61.00.00 Lamp-holders (under: Lamp-holders, plugs and sockets) (No.): General 2.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8536.69 Other (under: Lamp-holders, plugs and sockets).
- 8536.69.40 Coaxial connectors; cylindrical multicontact connectors; rack and panel connectors; printed circuit connectors; ribbon or flat cable connectors: General Free; Special none; Column 2 35%.
- 8536.69.40.10 Coaxial connectors (under: Coaxial connectors; cylindrical multicontact connectors; rack and panel connectors; printed circuit connectors; ribbon or flat cable connectors) (No.).
- 8536.69.40.20 Cylindrical multicontact connectors (No.).
- 8536.69.40.30 Rack and panel connectors (under: Coaxial connectors; cylindrical multicontact connectors; rack and panel connectors; printed circuit connectors; ribbon or flat cable connectors) (No.).
- 8536.69.40.40 Printed circuit connectors (under: Coaxial connectors; cylindrical multicontact connectors; rack and panel connectors; printed circuit connectors; ribbon or flat cable connectors) (No.).
- 8536.69.40.51 Ribbon or flat cable connectors (No.).
- 8536.69.80.00 Other (under: Other) (No.): General 2.7%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8536.70.00.00 Connectors for optical fibers, optical fiber bundles or cables (No.): General Free; Special none; Column 2 45%.
- 8536.90 Other apparatus (under: Electrical apparatus for switching or protecting electrical circuits, or for making connections to or in electrical circuits (for example, switches, relays, fuses, surge suppressors, plugs, sockets, lamp-holders and other connectors, junction boxes), for a voltage not exceeding 1,000 V; connectors for optical fibers, optical fiber bundles or cables).
- 8536.90.40.00 Terminals, electrical splices and electrical couplings; wafer probers (No.): General Free; Special none; Column 2 35%.
- 8536.90.60.00 Battery clamps of a kind used in motor vehicles of heading 8702, 8703, 8704 or 8711 (No.): General 2.7%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8536.90.85 Other (under: Other apparatus): General Free; Special none; Column 2 35%.
- 8536.90.85.10 Electrical distribution ducts (kg).
- 8536.90.85.30 Junction boxes (under: Other) (No.).
- 8536.90.85.85 Other (under: Other) (No.).
From MFG Calcs data: Switchgear, connectors, and controls
U.S. imports of switchgear, connectors, and controls (headings 8535, 8536, 8537, 8538) came to $42.13B in 2025, with $4.72B in calculated duty: an effective duty of 11.2%, every duty included.
Effective duty in Sep 2026: 10.2%, against 14.4% in Sep 2025.
Largest sources in 2025: Mexico $15.68B at 3.7% effective duty; China $3.54B at 50.9% effective duty; Canada $2.75B at 3.1% effective duty; Germany $2.60B at 10.9% effective duty; Japan $1.75B at 10.4% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.